Double Seat Ball Valve DELTA DKR2
ATEX Design
Instruction Manual: UK-0
APV
13. Service Instructions
13.1. Leakage reduction for DKR ball valve
If the valve is not dismantled from the pipeline for the installation
of the leakage reduction, it must be guaranteed that the
corresponding pipeline is depressurized!
1
2
3
4
D
D
A
B
C
Leakage reduction compl.
DN, Inch
ref.-No.
ID-No.
25, 1"
15-28-143/59
H138695
40 - 65, 1,5" - 2,5"
15-28-144/59
H138696
80, 100, 3", 4"
15-28-145/59
H138697
single parts
ref.-No.
ID-No.
Pos. 1
58-06-078/83
H76943
Pos. 2
58-06-119/83
H76961
DN, Inch
25 - 65, 1" - 2,5"
Pos. 3 2x
08-39-079/93
H14879
80, 100; 3", 4"
Pos. 3 3x
08-39-079/93
H14879
25, 1"
Pos. 4
15-28-143/47
H125803
40 - 65, 1,5" - 2,5" Pos. 4
15-28-144/47
H125802
80, 100, 3", 4"
Pos. 4
15-28-145/47
H125804
13.1.1. Installation of the leakage reduction
1.
Remove the two hexagon screws (A) and pull out the shaft bearing
(C) by careful turning.
2.
If the leakage reducer is not equipped with the guides (3) and the
two O-rings (1, 2), these parts can carefully be dismantled from the
shaft bearing (C) and used.
3.
Slightly grease o-rings (1, 2) before their installation.
! Do not use grease containing mineral oil for EPDM seals!
Slide the complete leakage reduction instead of the shaft bearing
over the shaft pivot (B) and tighten it with the hexagon screws (A)
at the housing flange (D).