![SPT Labtech Apricot S3 User Manual Download Page 10](http://html1.mh-extra.com/html/spt-labtech/apricot-s3/apricot-s3_user-manual_1352392010.webp)
© 2021 SPT Labtech Ltd
10
After unboxing the instrument, inspect for any visible
damage that may have occurred during shipping such
as scratches or dents.
After con rming that there is no damage you can
proceed.
o
Re-assemble and save the shipping crate for
future use.
The instrument is now ready for relocating.
Note: The instrument is quite heavy and requires multiple people to move it. Keep
your back straight and lift with your legs to avoid possible injury.
o
Lift the instrument by placing hands under the base plate of the instrument at
each corner.
o
When moving the instrument - be sure to lift only from the base of the
instrument.
o
Place the instrument on a steady, sturdy, at and level surface.
The instrument is now ready for installation.
Note: We recommend that you read through the Operating Instructions Manual
before you start the install process.
o
Use appropriate caution when operating this instrument.
o
Verify that the ON/OFF switch is in the OFF position.
o
Using the power cord provided, connect the instrument entry connector and
connect the opposite end to a power outlet with a ground connection.
o
The instrument is ready to turn on. Press the ON/OFF switch to the ON position.
Contact SPT Labtech immediately –
take a picture of the damage and
send it to
[email protected], and
contact the freight carrier.
Summary of Contents for Apricot S3
Page 1: ......
Page 2: ...2021 SPT Labtech Ltd 2 Notes...
Page 15: ...2021 SPT Labtech Ltd 15 Step 2 Unscrew silver screws on both sides...
Page 16: ...2021 SPT Labtech Ltd 16 Step 3 Raise the hood pull out the support rod to place the hood...
Page 21: ...2021 SPT Labtech Ltd 21 Here s a general overview of how a user will run the apricot S3...
Page 28: ...2021 SPT Labtech Ltd 28...
Page 59: ...2021 SPT Labtech Ltd 59...
Page 71: ...2021 SPT Labtech Ltd 71...