![Spring Well SS+ Installation Instructions Manual Download Page 8](http://html1.mh-extra.com/html/spring-well/ss/ss_installation-instructions-manual_1351546008.webp)
Additional Softener Head Steps
26) Insert the drain valve back
into the tank head. Ensure the
drain line isn’t pinched.
22) Pull out the blue tab behind
the drain valve, then pull the
valve out from the tank head.
23) Slide the provided hose
clamp over the end of the drain
line.
24) Press the drain line over the
barbed end of the drain valve you
pulled out of the tank head.
25) Align the hoes clamp over
the connection, then align the
screw on the hose clamp so that
it runs parallel to the connection
on the drain valve. Tighten the
clamp.
This step will require the materials listed below
21) Locate the drain on the left
side of the electronic tank head
on the softener tank,
Questions? Call (800)-589-5592
8
27) Insert the blue tab to lock
the drain valve back in position.
Softener Tank
(Already Installed)
Power
Supply
50’ Drain Line
Hose
Clamp
Zip Ties
9V Battery
Salt-Based Water Softener