![Spotwave Wireless SpotCell 100 User Manual Download Page 17](http://html1.mh-extra.com/html/spotwave-wireless/spotcell-100/spotcell-100_user-manual_1351213017.webp)
Spotwave Wireless Inc.
11
3.1.10 Installing the DDU on a roof
Note:
For optimal performance, the DDU should be installed as high as
possible when the installation is in a remote area
1.
Go to the roof with the DDU and position it (but do not mount it)
as close to its proposed final mounting location as possible.
The SCU does not have to be in its final position at this time, but it
should not be brought outdoors.
2.
Connect the DDU and SCU with the enclosed cable.
3.
Connect the power supply wires to the SCU by holding down the
blue tab and pushing the positive wire (marked with text) into the
positive (+) side of the connector. While still holding down the blue
tab push the remaining negative wire (identified by no text) into the
negative (-) side of the connector. Release the tab to secure the
power supply wires.
Figure 3.5:Inserting wires in SCU to supply power
Insert wires
here
Depress
tab here
TO BE UPDATED
Summary of Contents for SpotCell 100
Page 4: ...iv SpotCell 100 Release 1 0...
Page 27: ...Spotwave Wireless Inc 21...
Page 28: ...MOUNTING 22 SpotCell 100 Release 1 0...
Page 30: ...DISPLAYED INFORMATION 22 SpotCell 100 Release 1 0...
Page 36: ...TROUBLE SHOOTING INFORMATION 28 SpotCell 100 Release 1 0...
Page 42: ...SYSTEM SPECIFICATIONS 32 SpotCell 100 Release 1 0...
Page 46: ...INSTALLATION SAFETY REGARDING HAZARD OF SHOCK 36 SpotCell 100 Release 1 0...