![Spotnails SFN19 Operating Manual Download Page 10](http://html1.mh-extra.com/html/spotnails/sfn19/sfn19_operating-manual_1351160010.webp)
INSTRUCTION FOR OPERATION
1. Before operation
(1) Wear safety glasses & ear protection
(2) Do not connect the air supply
(3) Inspect screw tightness
(4) Check operation of the contact arm & trigger are moving smoothly
(5) Connect the air supply
(6) Check for air-leakage. (tool must have no air leaks.)
(7) Hold the tool with finger-off the trigger, then push the contact arm against the work-
surface. (the tool must not operate.)
(8) Hold the tool with contact arm free from work-piece and pull the trigger. (the tool must
not operate.)
2. Operation
Keep hands and body away from the nose piece when driving the fasteners to avoid injury.
Nail loading
(1) Disconnect the airline.
(2) Press LATCH (394539) to open DOOR (394571), then open MAGAZINE COVER
(394589).
(3) Adjust the height of NAIL SUPPORT (394592) according to nail length.
(4) Insert ALUMINUM DISC on top of nail support before loading 19mm nails.
(5) Place the first nail in the groove on FEED PAWL (394566).
(6) Close MAGAZINE COVER (394589), close DOOR (394571).
(7) Re-connect to airline.
Test operation
(1) Adjust the air pressure at 80psi. (5.5 bar) and connect the air supply.
(2) Without touching the trigger, depress the contact arm against the work-surface. Pull the
trigger. (the tool should fire the fastener.)
(3) With the tool off the work-surface, pull the trigger. Then depress the contact arm against
the work-surface. (the tool should fire the fastener.)
(4) Adjust the air pressure to the lowest possible setting according to the diameter and
length of fastener, also the hardness of work-surface.
Summary of Contents for SFN19
Page 13: ...TOOL SCHEMATIC SFN19 ...