Page 26
by 2” button bolts, washers on both sides, and (4) lock
nuts underneath.
23. Install (2) re-bars in the bottom holes of these pipes.
24. Install the assembly into the ground holes, so that the
top of the 27” angle plate matches to the holes in side of
the bottom of the transfer assembly, and so your ground
holes are correct so that they are on bubble and in
middle of their holes etc.
25. Connect with (2) 3/8” by 1 1/4” button bolts, no washer
on the outside and (2) 3/8” washer and lock nuts on
underside of deck. Re-check levels of all (6) posts and
the bottom plank and the entire transfer step. Make
sure it is all level and blocked.
SPECIFICATIONS:
Event: Transfer Station shall be constructed of #9 gage by 3/4”
flattened, expanded metal, including offset kickplates to fully
enclose gaps between decks and steps.
Paint: Shall be oven-cured plastisol
Hardware: Stainless Steel tamper resistant
MAINTENANCE:
Touch up any marred paint surfaces.
Periodically check hardware for integrity and tightness.
Summary of Contents for Zack 911-131
Page 1: ...Page 1 800 727 8180 www sportsplayinc com 911 131 Model Zack ...
Page 14: ...Page 14 Side view of installed post ...
Page 24: ...Page 24 ...
Page 31: ...Page 31 ...
Page 48: ...Page 48 1 2 4 3 ...
Page 49: ...Page 49 5 6 8 7 ...