902-958 DUAL LEG PRESS STATION 

INSTALLATION INSTRUCTION 

INSPECTION FORM 

!

 

MAKE COPIES OF THIS FORM TO USE FOR INSPECTION 

!

 

DOCUMENT ALL MAINTENANCE ACTIONS ON THE LIST AS WELL AS ANY NOT LISTED.   

!

 

INCLUDE DATES AND SIGNATURES 
 

Inspection Checklist 

Recommended 

Frequency 

Grade 

(Pass/Fail/NA) 

Date 

Inspected 

Date Repairs 

Completed 

Inspect Hardware 

Weekly 

 

 

 

Inspect Plastic Components 

Weekly 

 

 

 

Inspect Finish 

Monthly 

 

 

 

Inspect Footing 

Yearly 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 Inspector: _______________________ Signature: ___________________________________ Date: ___________________________ 

Maintenance Record 

Part 

Problem 

Corrective Action 

Date 

 

 

 

 

 

 

 

 

 

 

 

 

 

Summary of Contents for 902-958

Page 1: ...ight 271 lbs MAINTENANCE As the owner of the equipment you are responsible for maintenance of the equipment and the surrounding area A maintenance schedule must be developed and the equipment inspecte...

Page 2: ...TION PARTS LIST ID DESCRIPTION QTY 1 Dual Leg Press 1 2 Footing Frame 1 3 Mounting Cover 2 pieces 1 4 Hex Nuts 4 3 8 x 2 Button Head Bolt 2 3 8 Flat Washer 2 7 32 Allen 1 NOTE Keep a copy of these ins...

Page 3: ...n the next page as a reference It is the owner installers responsibility to check local building codes and to comply with those codes All footing depths listed here are recommendations and local soil...

Page 4: ...ng OD WARNING THIS EQUIPMENT IS DESIGNED FOR HEALTHY PEOPLE AGE 13 AND UP INSTALLATION TIPS TROUBLE SHOOTING Installation of the equipment is easy since the equipment itself is already assembled Alway...

Page 5: ...op plate is flush with the surface of the concrete After the concrete has cured install the equipment onto the footing frame by sliding the equipment into position and attaching with the nuts provided...

Page 6: ...t all metal components for coating damage If powder coating needs to be repaired sand surface and mask off area Coat with primer and once the primer has dried paint with color matching touch up paint...

Page 7: ...STED INCLUDE DATES AND SIGNATURES Inspection Checklist Recommended Frequency Grade Pass Fail NA Date Inspected Date Repairs Completed Inspect Hardware Weekly Inspect Plastic Components Weekly Inspect...