background image

902-289 6’ Spiral Slide

 

Page 

4

 

Rev. 07/22/03

 

SportsPlay Equipment, Inc., 5642 Natural Bridge, St. Louis, MO 63120  (314) 389-4140 

Installing deck clamps  

 

Install deck clamps to the center of the deck corners. If clamps are off 

center, then the line of posts will not be straight, nor will components 

connect correctly. Picture shows deck clamp being tightened to post with a 

3/8” X 1 ¼” Button Head bolt with a “T” nut on the deck side of the clamp. DO 

NOT over tighten.  If too tight the post will “swing.”  Tighten when post is 

level.  

 

 

Decks attach to deck clamps using ½” X 2 ½” Button Head bolts washer on top 

and bottom, with ½” lock nuts.   Connect the deck bolt firmly. 

 

 

 

Additional information on deck clamp and deck installation can be found in 

the section entitled, “Building the First Deck.” 

 

 

 

 

 

Building the first deck: 

 

Lay deck on ground, use deck as “jig”.  Place (4) deck clamps, one per 

corner, spray paint through middle of clamp onto ground.  These will be the 

centers of the postholes.  Remove deck and clamps.  Dig the (4) holes 22” 

deep and 12” wide.  Holes are straight down and flat-bottomed. Install 10” 

diameter plywood in hole bottoms. 

 

Summary of Contents for 902-289

Page 1: ...dents Resilient Surfacing should be used under all playground equipment Appropriate publications available at no charge from the Consumer Product Safety Commission include A Handbook for Public Playgr...

Page 2: ...required amount of resilient safety surfacing material For some equipment Use Fall zones can overlap See Consumer Product Safety Commission Guidelines Diameter and depth of footings illustrated are sa...

Page 3: ...beyond face of nut All washers T nuts and other fastener hardware used on round pipe or tubing must be hammered down to conform to the curved underlying surface to eliminate catch points DO NOT tight...

Page 4: ...ghten If too tight the post will swing Tighten when post is level Decks attach to deck clamps using X 2 Button Head bolts washer on top and bottom with lock nuts Connect the deck bolt firmly Additiona...

Page 5: ...4140 Deck clamp set to corners Dig first four holes Use marker to mark 22 from bottom of posts Use these marks so you can run a 4 level across marks to make sure the tops of the posts are equal to eac...

Page 6: ...mber and wedges to solidify the posts in their holes as you level the posts Re blocking may be necessary at times in order to achieve level You may also have to widen your holes if they are not dug ce...

Page 7: ...e deck clamps Use a level and a marker to make sure the clamps are level to each other Then place deck onto clamps and bolt This method works but is less stable than the first method The deck and post...

Page 8: ...nto bubble in the top or middle will throw off your evious work Adjust the post levels carefully not roughly pr When all 4 posts are plumb and stable drill through the deck clamps and into the posts w...

Page 9: ...lamps 42 Illustration on next page shows completed deck and 4 posts Deck and post are vertically and horizontally level and clamps are tight Posts are center to deck corners Roll pins are installed Av...

Page 10: ...lide Page 10 Rev 07 22 03 SportsPlay Equipment Inc 5642 Natural Bridge St Louis MO 63120 314 389 4140 Posts must be blocked solidly for a stable ongoing installation Blocks are removed just before con...

Page 11: ...1 Hardware Deck Clamps 2 Pipe Clamps 4 MAINTENANCE 1 Touch up any marred paint surfaces 2 Periodically check hardware for integrity and tightness INSTRUCTIONS The Spiral Slide can accommodate any siz...

Page 12: ...902 289 6 Spiral Slide Page 12 Rev 07 22 03 SportsPlay Equipment Inc 5642 Natural Bridge St Louis MO 63120 314 389 4140...

Page 13: ...ription QTY A Wall 1 B Clamps 4 Hardware MAINTENANCE Touch up any marred paint surfaces Periodically check hardware for integrity and tightness INSTRUCTIONS The ten rung wall is 48 wide and attached w...

Page 14: ...15 apart holes on top of deck Mark on ground for the two bottom legs 20 apart Remove ladder and dig two holes 12 wide and 24 deep Connect the bottom leg with 2 1 x 3 8 button head bolt washer on top a...