March 2, 2016
7
581-422 12’ PRIMARY TRIPOD SWING
INSTALLATION INSTRUCTION
INSTALLATION STEPS CONTIUDE
Continue:
__6) Slide the pipe into the swing end fitting until it’s flush with
the end fitting then mark the top and bottom hole. With a small drill
bit drill the marked spots then drill with a 7/16” drill bit through the
small holes in the pipe. Now secure it with bolt, lock washer and
the button head nut. See (Detail C).
__7)
Attaching Swing Hangers:
You will need eight swing
hangers (5), eight D Shackles (8), eight 4/O Chain (7). Assemble
the D-shackles and chain to the swing hangers. Attach the swing
hangers to the top rail following spacing on page 4. See (Detail D).
__8)
Attaching Seats:
To attach seats to the chain. You will need
the four cut proof seats (6), eight of the D shackles (8). Use the D
shackles and hook the chain and the cut proof belt seat to it. Then
tighten the bolt that holds the chain and seat. See (Detail E).
__9)
Dig footing holes:
Footing holes may be marked out and dug
from footing layout, however, it is easier to position swing in
proper location, mark holes, move swing aside, and dig holes.
__10) Stand swing upright onto legs and brace in footing holes so
that 2’ – 3’ of pipe will be under intended level of resilient
surfacing and the top rail is at desired height. Plumb and level
entire unit. Tighten all set screws.