background image

  

 

March 2, 2016  

 

 

581-422 12’ PRIMARY TRIPOD SWING 

INSTALLATION INSTRUCTION 

 

 

INSTALLATION DETAILS 

 

Recommended crew (Adult)

: 2

 

 

Installation time

: 4 hr

 

 

User age

: 5-12 

 

 

Use zone

: 48’ x 44’

 

 

Weight

: 360 lbs

 

       

 

SURFACING: Use of safety surfacing in compliance with 
ASTM specification F1292 is required. 

MAINTENANCE: 

 

As the owner of the playground you are responsible for 
maintenance of the equipment and play area.  A 
maintenance schedule must be developed and the 
equipment inspected frequently.  A maintenance section 
that includes component specific maintenance 
requirements is included at the end of this manual. 

 

Be sure to inspect surfacing for foreign objects that could 
cause injury and that sufficient surfacing is in place in 
accordance with ASTM and CPSC standards. 

Summary of Contents for 581-422

Page 1: ...2 PRIMARY TRIPOD SWING Installation Guide 1 INSTALLATION INSTRUCTIONS 581 422 12 PRIMARY TRIPOD SWING Please read the entire manual before beginning installation 1 CTN 10 PIPE 11 TOTAL PCS 360 WEIGHT...

Page 2: ...D SWING Installation Guide 2 TAB SECTION INDEX 1 3D AND 2D DRAWINGS 2 INSTALLATION GUIDE 3 INSTALLATION STEPS 4 COMPONENT INSTALLATION 5 APPENDIX 6 ORIGINAL COMPONENT MAINTENANCE FORMS 7 COMPLETED COM...

Page 3: ...ING 10 SITE REQUIREMENTS 10 MAINTENANCE 10 PLAY AREA 10 Installation Punch List Error Bookmark not defined Footing Layout Example Error Bookmark not defined Step 1 Layout 11 Step 2 Holes 11 Step 3 Dec...

Page 4: ...581 422 12 PRIMARY TRIPOD SWING Installation Guide 4...

Page 5: ...581 422 12 PRIMARY TRIPOD SWING Installation Guide 5...

Page 6: ...ure and sunlight SportsPlay recommends carefully unpacking the unit and taking an inventory before storing the equipment Care should be taken with all powder coated and thermoplastic coated parts to p...

Page 7: ...nstalled on vertical posts as per ASTM F1487 Instructions for the placement of these labels are included in the appendix of this booklet SportsPlay will provide manufacturer identification labels that...

Page 8: ...tion and Public Affairs Washington DC 20207 USA Call 1 800 638 2772 US and Canada only Call 301 504 0990 Direct Link http www cpsc gov For a copy of either the standard for surfacing ASTM F1292 or for...

Page 9: ...ole digger Wheelbarrow Large construction bar 5 Claw hammer Large dead blow rubber hammer Small sledgehammer to use in blocking the posts Strong and sturdy step ladders Extension cords power supply Le...

Page 10: ...closed immediately A maintenance section is included in the appendix of this instruction booklet If a part is missing or damaged the playground must be put out of service while the part is replaced La...

Page 11: ...xt page 2 Once the structure is in the desired location within the play area mark the locations of the post by inserting a stake into the center of each post location see drawing below for an example...

Page 12: ...re you may start installing concrete You must use concrete with a minimum of 2 500 psi 2 Always pre mix the concrete to the manufactures directions before pouring it into the hole Never put dry concre...

Page 13: ...are at some point you may want to apply lubricating oil to the hardware Stainless steel hardware has a tendency to seize so if you are planning on removing the hardware you may want to apply lubricant...

Page 14: ...broken equipment Do not allow children to play on broken equipment or equipment with missing components Make sure there are no unsafe modifications especially ropes tied to equipment Remove all unsafe...

Page 15: ...422 12 PRIMARY TRIPOD SWING Installation Guide 15 X SET SCREW D SHACKLE 2 3 8 SWING HANGER 5 16 X 1 BUTTON HEAD NUT 5 16 X 2 BUTTON HEAD BOLT 5 16 LOCK WASHER 3 16 ALLEN YELLOW ALLEN BLUE 5 16 ALLEN...

Page 16: ...581 422 12 PRIMARY TRIPOD SWING Installation Guide 16 COMPONENT INSTALLATION INSTRUCTIONS...

Page 17: ...uired MAINTENANCE As the owner of the playground you are responsible for maintenance of the equipment and play area A maintenance schedule must be developed and the equipment inspected frequently A ma...

Page 18: ...elt Seat 4 7 317 140 4 O Chain x 9 6 Long 8 8 342 506 D Shackle 16 9 196 802 x Socket Set Screw 14 10 116 545 5 16 x 2 Button Head Bolt 4 11 216 512 5 16 x 1 Button Head Nut 4 12 326 501 5 16 Lock Was...

Page 19: ...he bottom of the support post or slide leg on a suitable flat blocking material to prevent it from sinking further into the soil We recommend you use a brick block of wood or several inches of gravel...

Page 20: ...March 2 2016 4 581 422 12 PRIMARY TRIPOD SWING INSTALLATION INSTRUCTION ELEVATION AND FOOTING LAYOUT VIEW...

Page 21: ...to take them out to make an adjustment It is recommended that you add a drop of oil to bolts that may have to be removed before you install them Do not tighten bolts all the way until the unit is comp...

Page 22: ...will be in approximately correct position Assemble swing frame on side on ground If more than one section assemble section by section __4 Attach Center Fitting to End Fitting To do this you will need...

Page 23: ...e swing hangers Attach the swing hangers to the top rail following spacing on page 4 See Detail D __8 Attaching Seats To attach seats to the chain You will need the four cut proof seats 6 eight of the...

Page 24: ...turer s directions before you pour it into the footing hole Once the footing has been filled with concrete you should rope of the area for a minimum of 48 hours to allow the concrete set properly __12...

Reviews: