381-403H WHEELCHAIR SWING 

Installation Guide 

 

 

 

10 

Step 3: Post & Component Installation 

1.

 

We recommend installing the posts once the post are square and level 
you may add the concrete (concrete with a minimum of 2,500 psi should 
be used).  Mix concrete per manufacturers instructions and let it cure for 
at least 24 hours before continuing. 

2.

 

NEVER LEAVE THE INSTALLATION SITE UNATTENDED 
WITHOUT ROPING OFF THE AREA AND EQUIPMENT, 
INSTALLING ALL HARDWARE, SECURING TOOLS AND 
EQUIPMENT, AND COVERING OPEN HOLES WITH A RIGID 
MATERIAL (PLYWOOD).  CHILDREN WILL TRY TO USE 
THE EQUIPMENT EVEN THOUGH ITS NOT FULLY 
ASSEMBLED.  YOU MUST TAKE ACTION TO PREVENT 
INJURY AND DAMAGE.

 

Step 4: Concrete 

1.

 

Verify all swing posts and fittings are tight, level and square.  Once the 
unit is verified to be level and square you may start installing concrete.  
You must use concrete with a minimum of 2,500 psi. 

2.

 

Always pre mix the concrete to the manufactures directions before 
pouring it into the hole.  Never put dry concrete in the hole.  Typically 
each main posthole requires two 80-pound bags of concrete. 

3.

 

Allow concrete to set in accordance with manufacturers directions.  Fill 
holes too about 2” below the surface with concrete.  Once the hole has 
been filled with concrete, slope the top of the concrete down and away 
from the post to keep water from seeping between the post and the 
concrete. 

4.

 

Secure playground area to prevent access while the concrete is setting 
for a minimum of 48 hours. 

5.

 

SportsPlay recommends having a CPSI (certified playground safety 
inspector) present during installation.  If that’s not possible you should 
have the completed playground (after surfacing is in place) inspected by 
a CPSI. 

Step 5: Last Step 

1.

 

After concrete has completely set, backfill all holes with dirt. 

2.

 

Install surfacing.

Summary of Contents for 381-403H

Page 1: ...HEELCHAIR SWING Installation Guide 1 INSTALLATION INSTRUCTIONS 381 403H ACCESSIBLE WHEELCHAIR SWING Please read the entire manual before beginning installation 1 CTN 5 PIPE 2 WF 8 TOTAL PCS 148 WEIGHT...

Page 2: ...381 403H WHEELCHAIR SWING Installation Guide 2...

Page 3: ...381 403H WHEELCHAIR SWING Installation Guide 3...

Page 4: ...g them to the part list and component instruction pages Always compare the number of pallets cartons or other items the BOL has listed with the number actually received Note the any discrepancies on t...

Page 5: ...esigned to install on a clear and level site There should be no more than 3 of grade variations in a 10 span Footing layout is the first critical step once the installation begins Mark all holes using...

Page 6: ...n and Public Affairs Washington DC 20207 USA Call 1 800 638 2772 US and Canada only Call 301 504 0990 Direct Link http www cpsc gov For a copy of either the standard for surfacing ASTM F1292 or for pl...

Page 7: ...digger Wheelbarrow Large construction bar 5 Claw hammer Large dead blow rubber hammer Small sledgehammer to use in blocking the posts Strong and sturdy step ladders Extension cords power supply Level...

Page 8: ...sed immediately A maintenance section is included in the appendix of this instruction booklet If a part is missing or damaged the playground must be put out of service while the part is replaced Lack...

Page 9: ...e 2 Once the structure is in the desired location within the play area mark the locations of the post by inserting a stake into the center of each post location see drawing below for an example If usi...

Page 10: ...you may start installing concrete You must use concrete with a minimum of 2 500 psi 2 Always pre mix the concrete to the manufactures directions before pouring it into the hole Never put dry concrete...

Page 11: ...at some point you may want to apply lubricating oil to the hardware Stainless steel hardware has a tendency to seize so if you are planning on removing the hardware you may want to apply lubricant to...

Page 12: ...g from dangerous heights displacing of surfacing etc Inspecting for missing or broken equipment Do not allow children to play on broken equipment or equipment with missing components Keep children in...

Page 13: ...removes the swing platform of secures it to the nearest support to prevent unsupervised mis use of the equipment Additionally it is recommended that a barrier be placed in front on the sides and behi...

Page 14: ...IR SWING Installation Guide 14 X SET SCREW D SHACKLE 2 3 8 SWING HANGER 5 16 X 1 BUTTON HEAD NUT 5 16 X 2 BUTTON HEAD BOLT 5 16 LOCK WASHER 3 16 ALLEN WRENCH YELLOW BAG ALLEN WRENCH BLUE BAG 5 16 ALLE...

Page 15: ...381 403H WHEELCHAIR SWING Installation Guide 15 COMPONENT INSTALLATION INSTRUCTIONS...

Page 16: ...d MAINTENANCE As the owner of the playground you are responsible for maintenance of the equipment and play area A maintenance schedule must be developed and the equipment inspected frequently A mainte...

Page 17: ...506 D Shackle 2 6 196 802 x Socket Set Screw 6 7 116 545 5 16 x 2 Button Head Bolt 2 8 216 512 5 16 x 1 Button Head Nut 2 9 326 501 5 16 Lock Washer 2 10 416 350 3 16 Socket Key 2 11 416 500BPK 5 16...

Page 18: ...ottom of the support post on a suitable flat blocking material to prevent it from sinking further into the soil We recommend you use a brick block of wood or several inches of gravel The footing depth...

Page 19: ...April 8 2020 4 3381 403H WHEELCHAIR SWING INSTALLATION INSTRUCTION ELEVATION AND FOOTING LAYOUT VIEW...

Page 20: ...ake an adjustment It is recommended that you add a drop of oil to bolts that may have to be removed before you install them Do not tighten bolts all the way until the unit is completely assembled and...

Page 21: ...correct position Assemble swing frame on side on ground If more than one section assemble section by section __4 Attach Swing End to Legs To do this you will need four 1 7 8 x 11 pipe 2 two swing end...

Page 22: ...ide and dig holes __8 Stand swing upright onto legs and brace in footing holes so that 2 3 of pipe will be under intended level of resilient surfacing and the top rail is at desired height Plumb and l...

Page 23: ...s set back fill dirt over the footing holes inspect the area and components for tools hazardous debris and sharp edges Verify all components are installed and all hardware is tight and then install th...

Reviews: