SportsPlay 301-147 Installation Instruction Download Page 12

 
  
 

November 15,2018  

 

 

12 

301-147 8’ WHEELCHAIR ACCESSIBLE MGR 

INSTALLATION INSTRUCTION 

 

PERIMETER RING INSTALLATION 

 
The perimeter ring is designed to create a wall around the 
perimeter of the merry go round. The ring should be installed 
after the merry go round has been installed. 
The ring is manufactured in four sections and it can be 
difficult to install and must be installed level with the top 
surface of the platform and the space between the top of the 
ring and the MGR platform must be equal around the entire 
perimeter of the MGR platform. Each section has a top and 
bottom flange for strength and a flange at each end for 
connecting ring sections together with bolts. 
We have included leveling feet on each section of the ring 
(installing a block below each foot can be helpful) to help 
level the ring. Additionally, we include chain and turnbuckle 
anchors that attach to the ring on one end and are anchored to 
the ground with a ground spike on the other end. These 
anchors provide additional adjustment for ring leveling, 
adjustment for spacing of the ring and merry go round 
platform and help hold the ring in position when backfilling. 
Maintaining separation between the ring and platform is 
essential in allowing the platform to spin.  
We also have holes on the bottom ring flange which 
additional anchor spikes (or even concrete anchors if you 
wish to install footings) can be driven through once leveled to 
help hold the ring in position. 
 

__13.  If using any material under feet, have them ready. Attach 
the feet to the bottom of the ring sections and secure. 
 
__14. Place two ring sections together and connect them to each 
other (do not tighten completely) bottom and middle holes on the 
ends using 3/8” x 1 

¼

” bolts, two washers and an nut. Attach the 

chains to the turnbuckles at each end of the turnbuckle using D-
shackles and then the end of one chain the top hole on the 
perimeter ring using the same size bolt and washer, through the 
chain link, then the ring sections, another washer and finally 
secure with the nut (do not tighten). 
 
__15 Repeat for the remaining ring sections. 
 
__16. Level the top of the ring to the top of the MGR platform and 
tighten bolts as you go. Use the feet to help level and hold the 
ring. Use the turnbuckle anchors by anchoring the other end of the 
chain into the ground with the spikes that were included.  This will 
help keep the ring in position. 

Summary of Contents for 301-147

Page 1: ...owner of the playground you are responsible for maintenance of the equipment and play area A maintenance schedule must be developed and the equipment inspected frequently Periodic Inspections maintenance repair and replacement of damaged parts is necessary for the safe operation and use of the equipment A maintenance section that includes component specific maintenance requirements is included at ...

Page 2: ...6 701 bps 3 8 x 1 1 4 Button Head Bolt 72 13 316 601 3 8 Flat Washer 160 14 226 602 3 8 Nylon Lock Nut 84 15 416 505 bpk 7 32 Socket Key 2 16 Hand Rail Touch up Paint 1 17 126 707 3 8 x 1 1 2 Button Head Bolt 8 18 913 807 R ADA 8 QTR DECK RIGHT 2 19 913 808 R ADA MAIN HANDRAIL RT 2 PARTS LIST CONTINUED ID PART DESCRIPTION QTY 20 913 809 L ADA GATE LEFT 2 21 913 809 R ADA GATE RIGHT 2 22 913 810 AD...

Page 3: ...WHEELCHAIR ACCESSIBLE MGR INSTALLATION INSTRUCTION IMPORTANT UNIT IS DESIGNED FOR POUR IN PLACE RUBBER SAFETY SURFACING OR RUBBER MATS USE OF ANY OTHER SAFETY SURFACING WILL VOID THE MANUFACTURERS WARANTY AND COULD CAUSE AN INJURY ...

Page 4: ...November 15 2018 4 301 147 8 WHEELCHAIR ACCESSIBLE MGR INSTALLATION INSTRUCTION ...

Page 5: ...p is for the merry go round post It installs the same as a standard post but as this unit is flush mount the depth of that hole from the surface is greater Once the excavation has been completed you can install the post and drainage 1 Post depth is 5 from the top of the planned finished height of the safety surfacing the main excavation is 12 wide down to 2 the remaining width for the post is 3 at...

Page 6: ...November 15 2018 6 301 147 8 WHEELCHAIR ACCESSIBLE MGR INSTALLATION INSTRUCTION ...

Page 7: ...ETY SURFACING WILL VOID THE MANUFACTURERS WARANTY AND COULD CAUSE AN INJURY Apply Loctite to all bolts during assembly prior to completely tightening them Do not use impact gun as Stainless Steel hardware can occasionally be difficult to use particularly if you need to take them out to make an adjustment It is recommended that you add a drop of oil to bolts that may have to be removed before you i...

Page 8: ...November 15 2018 8 301 147 8 WHEELCHAIR ACCESSIBLE MGR INSTALLATION INSTRUCTION EXCAVATION AND FOOTING VIEW SIDE VIEW ABOVE TOP DOWN RIGHT ...

Page 9: ...e perfectly level in all directions before adding concrete for safety and durability of product __3 Add concrete to hole crown the top of the concrete down and away from the post to help prevent water build up around the post Periodically check the post to ensure it is level while concrete is curing Brace the post into position if necessary Before installing remaining MGR components wait till conc...

Page 10: ...om one to the other so that the same decks are placed diagonally When tightening the bolts move around the entire unit and tighten them evenly to ensure the deck sections are properly aligned and to ensure there are no gaps between the deck sections Connect the support arm 6 to the deck sections as well as the deck sections to each other using 1 1 4 bolts 12 3 8 washers and 3 8 nuts Refer to Detai...

Page 11: ...rail __11 Once all four handrails have been positioned attach the Upper Handrail 22 to the four handrails using two T clamps at each location and securing in position by inserting a 5 16 x 1 1 2 Button Head bolt through a 5 16 flat washer a T clamp the handrail another T clamp and into a 16 x 1 button head not When the T clamp is in position on the main handrail tighten bolts Repeat at all four ma...

Page 12: ...form and help hold the ring in position when backfilling Maintaining separation between the ring and platform is essential in allowing the platform to spin We also have holes on the bottom ring flange which additional anchor spikes or even concrete anchors if you wish to install footings can be driven through once leveled to help hold the ring in position __13 If using any material under feet have...

Page 13: ...November 15 2018 13 301 147 8 WHEELCHAIR ACCESSIBLE MGR INSTALLATION INSTRUCTION ...

Page 14: ...November 15 2018 14 301 147 8 WHEELCHAIR ACCESSIBLE MGR INSTALLATION INSTRUCTION ...

Page 15: ...November 15 2018 15 301 147 8 WHEELCHAIR ACCESSIBLE MGR INSTALLATION INSTRUCTION ...

Page 16: ...kfill the area up to the ring We recommend that you fill and pack the area directly against the ring and around each turnbuckle and chain anchor by hand to prevent shifting and to ensure they are properly filled Backfill to the height needed for the surfacing and surfacing base After the area has been backfilled you will then install the safety surfacing Use images on previous page as a reference ...

Reviews: