background image

 
  
 

November 15,2018  

 

 

11 

301-147 8’ WHEELCHAIR ACCESSIBLE MGR 

INSTALLATION INSTRUCTION 

 

__9.  There are two types of handrails, a left and right. Ensure 
that the sleeve for the left handrail and sleeve for the right are 
pointed at each other so you can install the gates properly as 
shown by the arrows to the left 
__10. Attach the Handrails (2 & 19) to the Deck Sections (1) 
using 1 1/4” bolts, one 3/8 washer  (Detail f shows a nut under 
the deck, however this unit has factory installed nuts). It is easier 
to attach and leave loose until after you have attached the upper 
handrail. 
__11.  Once all four handrails have been positioned, attach the 
Upper Handrail (22) to the four handrails using two T-clamps at 
each location and securing in position by inserting a 5/16” x 1 
1/2” Button Head bolt through a 5/16” flat washer a T-clamp the 
handrail, another T-clamp and into a %/16” x 1” button head not. 
When the T-clamp is in position on the main handrail, tighten 
bolts. Repeat at all four main handrail and upper handrail 
connection points. 
__12.  

Governor Tension Adjustment

: Back off the jamb nut 

on the governor assembly (attached to post assembly) and turn 
the adjustment nut until the rubber wheel is pushing firmly onto 
the sleeve of the hub assembly.  Once wheel is firmly against the 
hub, tighten the jamb nut to secure it into position. (See Detail B)  

 

 

 

 

Summary of Contents for 301-147

Page 1: ...owner of the playground you are responsible for maintenance of the equipment and play area A maintenance schedule must be developed and the equipment inspected frequently Periodic Inspections maintenance repair and replacement of damaged parts is necessary for the safe operation and use of the equipment A maintenance section that includes component specific maintenance requirements is included at ...

Page 2: ...6 701 bps 3 8 x 1 1 4 Button Head Bolt 72 13 316 601 3 8 Flat Washer 160 14 226 602 3 8 Nylon Lock Nut 84 15 416 505 bpk 7 32 Socket Key 2 16 Hand Rail Touch up Paint 1 17 126 707 3 8 x 1 1 2 Button Head Bolt 8 18 913 807 R ADA 8 QTR DECK RIGHT 2 19 913 808 R ADA MAIN HANDRAIL RT 2 PARTS LIST CONTINUED ID PART DESCRIPTION QTY 20 913 809 L ADA GATE LEFT 2 21 913 809 R ADA GATE RIGHT 2 22 913 810 AD...

Page 3: ...WHEELCHAIR ACCESSIBLE MGR INSTALLATION INSTRUCTION IMPORTANT UNIT IS DESIGNED FOR POUR IN PLACE RUBBER SAFETY SURFACING OR RUBBER MATS USE OF ANY OTHER SAFETY SURFACING WILL VOID THE MANUFACTURERS WARANTY AND COULD CAUSE AN INJURY ...

Page 4: ...November 15 2018 4 301 147 8 WHEELCHAIR ACCESSIBLE MGR INSTALLATION INSTRUCTION ...

Page 5: ...p is for the merry go round post It installs the same as a standard post but as this unit is flush mount the depth of that hole from the surface is greater Once the excavation has been completed you can install the post and drainage 1 Post depth is 5 from the top of the planned finished height of the safety surfacing the main excavation is 12 wide down to 2 the remaining width for the post is 3 at...

Page 6: ...November 15 2018 6 301 147 8 WHEELCHAIR ACCESSIBLE MGR INSTALLATION INSTRUCTION ...

Page 7: ...ETY SURFACING WILL VOID THE MANUFACTURERS WARANTY AND COULD CAUSE AN INJURY Apply Loctite to all bolts during assembly prior to completely tightening them Do not use impact gun as Stainless Steel hardware can occasionally be difficult to use particularly if you need to take them out to make an adjustment It is recommended that you add a drop of oil to bolts that may have to be removed before you i...

Page 8: ...November 15 2018 8 301 147 8 WHEELCHAIR ACCESSIBLE MGR INSTALLATION INSTRUCTION EXCAVATION AND FOOTING VIEW SIDE VIEW ABOVE TOP DOWN RIGHT ...

Page 9: ...e perfectly level in all directions before adding concrete for safety and durability of product __3 Add concrete to hole crown the top of the concrete down and away from the post to help prevent water build up around the post Periodically check the post to ensure it is level while concrete is curing Brace the post into position if necessary Before installing remaining MGR components wait till conc...

Page 10: ...om one to the other so that the same decks are placed diagonally When tightening the bolts move around the entire unit and tighten them evenly to ensure the deck sections are properly aligned and to ensure there are no gaps between the deck sections Connect the support arm 6 to the deck sections as well as the deck sections to each other using 1 1 4 bolts 12 3 8 washers and 3 8 nuts Refer to Detai...

Page 11: ...rail __11 Once all four handrails have been positioned attach the Upper Handrail 22 to the four handrails using two T clamps at each location and securing in position by inserting a 5 16 x 1 1 2 Button Head bolt through a 5 16 flat washer a T clamp the handrail another T clamp and into a 16 x 1 button head not When the T clamp is in position on the main handrail tighten bolts Repeat at all four ma...

Page 12: ...form and help hold the ring in position when backfilling Maintaining separation between the ring and platform is essential in allowing the platform to spin We also have holes on the bottom ring flange which additional anchor spikes or even concrete anchors if you wish to install footings can be driven through once leveled to help hold the ring in position __13 If using any material under feet have...

Page 13: ...November 15 2018 13 301 147 8 WHEELCHAIR ACCESSIBLE MGR INSTALLATION INSTRUCTION ...

Page 14: ...November 15 2018 14 301 147 8 WHEELCHAIR ACCESSIBLE MGR INSTALLATION INSTRUCTION ...

Page 15: ...November 15 2018 15 301 147 8 WHEELCHAIR ACCESSIBLE MGR INSTALLATION INSTRUCTION ...

Page 16: ...kfill the area up to the ring We recommend that you fill and pack the area directly against the ring and around each turnbuckle and chain anchor by hand to prevent shifting and to ensure they are properly filled Backfill to the height needed for the surfacing and surfacing base After the area has been backfilled you will then install the safety surfacing Use images on previous page as a reference ...

Reviews: