Summary of Contents for 301-145
Page 1: ...MUSHROOM KOTTAGE ASSEMBLY PLAN...
Page 2: ...Place the platform flat on the floor...
Page 3: ...Slightly lift the platform and place it on the ledge in the entrainment platform on the bench...
Page 4: ...Slightly lift the platform and place the ledge in the recessed platform on the slide...
Page 6: ...Place the wall where the phone and abacus are located on the bank...
Page 7: ...Place it against the second wall...
Page 15: ...Insert your hand into this hole and tighten the bolt with 10x40 washers and M10 nut...
Page 19: ...Attach 4 mm plastic plugs to the connection holes of the butterfly heart and bladder...
Page 20: ...Place the phone on the hook on the inside of the wall...