40
4. ASSEMBLY INSTRUCTIONS
53
55
13L
13R
59
59
45
45
45
45
1
9
4. Step
1.
Remove the 2 premounted screws (27) and 2 self-tapping screws (59) in the main
frame.
2.
Hold the bottle holder (55) and the side panels (13L/R) on the main device. Connect
both panels with the 4 screws (45) premounted to the left panel (13L). Secure
everything by reinserting the previously removed 2 screws (27) and 2 self-tapping
screws (59).
3.
Lock the slide rail by turning the set screw (53) clockwise.
Note:
The set screw (53) is used to lock the position of the slide rail (26). It goes through the
panel, the slot on the main device and through the last holes on the slide rail. It fastens into
the thread on the opposite panel. If the slide rail is unfolded, guide the set screw through
the upper openings on the panel.
If the slide rail is folded up, guide the set screw through the lower openings on the panel.
•
Slightly lift the main frame before inserting the set screw (53).
•
Make sure the holes for the set screw are directly atop one another.
•
Insert the set screw through both holes and screw tight.
Caution!
The set screw must be fastened tightly to prevent the slide rail from moving unintentionally.
SP-MR-009-iE-IM-INT-V09-TCHIBO.indb 40
26/9/2017 5:24 PM
Summary of Contents for SP-MR-009-iE
Page 29: ...28 DEUTSCH 12 EXPLOSIONSZEICHNUNG SP MR 009 iE IM INT V09 TCHIBO indb 28 26 9 2017 5 24 PM ...
Page 57: ...56 13 EXPLODED DIAGRAM SP MR 009 iE IM INT V09 TCHIBO indb 56 26 9 2017 5 24 PM ...
Page 85: ...84 13 VUE ÉCLATÉE SP MR 009 iE IM INT V09 TCHIBO indb 84 26 9 2017 5 24 PM ...
Page 113: ...112 13 DISEGNO ESPLOSO SP MR 009 iE IM INT V09 TCHIBO indb 112 26 9 2017 5 24 PM ...
Page 141: ...136 13 PLANO DETALLADO SP MR 009 iE IM INT V09 TCHIBO indb 136 26 9 2017 5 25 PM ...