Operating/assembly instructions
Ballet barre base
Sport-Thieme GmbH
38367 Grasleben / Germany
Tel: +49 (0)53 5718 181
Fax: +49 (0)53 5718 190
Prod. code: 122 4362
page 3 / 4
04/2016
- Ensure that the base is mounted to a solid floor!
- Starting with the desired position for the base (pos. 1), mark the drilling
holes.
- Drill the holes using a suitable masonry drill bit and put in the wall plugs
(pos. 4).
- Now, put the three hex screws (pos. 2) with washers (pos. 3) through the
base’s holes and tighten them in the wall plugs using a hex key.
Step 2
- Screw the two ballet barres (pos. 6) to the base (pos. 1) using the four included
wood screws (pos. 5).
- In order to prevent possible chipping, the ballet barres can be pre-drilled
using a 2 mm wood drill bit if required.
- If several bases are used, determine the distances between them
individually according to your needs and dependent on the barres you have
selected. The distance should not be more than 1.50 m.
Caution: Do not overload or climb the equipment!