
SPOGG Sport-Güter GmbH • 35614 Aßlar/Berghausen • Germany
• www.hally-gally-spielplatzgeraete.de
T:\PLAY\Play Installation Instructions\Installation Instructions 2012-2013\20_01_150-01-en-006.doc
- 31 -
14 Hand Over Document
After the installation of the equipment pass the installation and mainte-
nance documents to the operator. The operator has to receive the hand
over documents. The complete filled and signed hand over document
should be sent to the supplier.
Art.-No.:
20.01.150
Type of Item: Tower Carousel
Serial Number: _________________________________________________
Customer or Operator (Local Authority, School, etc.):
______________________________________________________________
______________________________________________________________
Competent Person in Charge:
______________________________________________________________
______________________________________________________________
Installation Company (Address):
______________________________________________________________
______________________________________________________________
Responsible Assistant (Assembler):
______________________________________________________________
______________________________________________________________
Received the complete assembly instructions, maintenance instructions and
maintenance printout
______________________________________________________________
(Signature of Operator)
(Signature of Installation Company)
(Stamp)
Date: ___________________