
Data di emissione:
Luglio, 2013
Revisione:
1
Pag. :
7/21
1.
INSTALLATION AND OPERATION PROCEDURES
After replacing the machine standard lid by the Autofill cover, it is necessary to precisely
connect the automatic filling system.
Connect to each cover the two JG elbow (A) and join, only to the left one of the product
inlet, also the connection for hose stem (B).
CONNECTION TO THE HOSE FOR THE SYRUP
The hoses for syrup are those with the larger diameter.
Join one of the two ends to the connection (left entrance if looking the cover from the
back) and fit the other end into the tank of syrup; insert a single check valve E just
outside the tank as indicated in the
picture.
!WARNING!
This machine has been designed for
standard liquid syrups so it’s
recommended to avoid the usage of pulpy
or very thick products.
!WARNING!
It is essential to execute the sanitization
procedures of the syrup circuit at least
once a week and every time the type of
product is changed.
Replace the tank full of syrup by a tank
full of sanitizing liquid and execute some
dispensing cycles;
Execute some additional 3 or 4 cycles
replacing the sanitizing liquid by hot
water in order to rinse the whole
system;
The system is ready to dispense the
syrup.
A
B
E
E