Data di emissione:
Settembre, 2016
Revisione:
1
Pag. :
29/44
10. OPERATING INSTRUCTIONS
a) Activate the general switch (D);
b) Each bowl is controlled by two switches which
are activated as follows:
- to make ice slush or sorbets: first select the
switch (1) (L for left bowl, C for the central one
and R for the right one) to activate the mixer
components, then select the corresponding
switch (2) to activate the cooling system in the
freeze mode.
- in order to activate the defrost mode: select
the switch (1) (L for left bowl, C for the central
one and R for the right one) to activate the
mixer components, then select the
corresponding switch (L) to activate the cooling
system at a positive temperature.
c) The (E) switch controls the covers’ LED lights.
! Warning !
If the machine is turned off at night, with the
bowls filled, or just partially filled, a layer of
solid ice may form on the surface, due to the
natural separation of the unmixed product. In
this case, before turning the machine back on, it
is necessary to verify for the product complete
melting in order to prevent damage to the
mixing auger.
!CAUTION!
IPRO is equipped with an insulated bowl
that will preserve the product temperature
for many hours so once it will be necessary
to operate in defrost/chill mode, we
recommend to extend the duration of this
operating mode until the product complete
melting.
CUT/OUT alarm and safety pressure
switched intervention
If the unit is equipped with the safety pressure
switch, the red light F on the unit right side,
advices the user when the safety pressure
switch has been activated and needs to be
manually re-activated.
The manually re-start button is seated under
the unit near the right side as indicated by the
picture below.
In order to find and fix the root conditions that
have forced its activation, please see the
chapter 8.
Summary of Contents for IPro 2 W
Page 2: ...Data di emissione Settembre 2016 Revisione 1 Pag 2 44 ITALIANO PAG 3 ENGLISH PAGE 21 ...
Page 39: ...Data di emissione Settembre 2016 Revisione 1 Pag 39 44 15 SCHEMA ELETTRICO WIRING DIAGRAM ...
Page 40: ...Data di emissione Settembre 2016 Revisione 1 Pag 40 44 ...
Page 41: ...Data di emissione Settembre 2016 Revisione 1 Pag 41 44 ...
Page 42: ...Data di emissione Settembre 2016 Revisione 1 Pag 42 44 ...