background image

7

RackPack 4

Scope Of Delivery

• 

The RackPack 4 frame including all blind panels and the front panel (if modules are not 
fitted  already).  Please  note  that  all  modules  are  shipped  without  the  aluminum  front 
panel. You need it when you fit a module into the frame. Therefore make sure that you 
handle the aluminum front panels with the same care and prudence as any other unit 
surface. All screws holding front and rear blind and front panels are needed for the fitting 
of modules. Two additional screws are shipped with every module.

• 

The AC power cord to feed the IEC-spec, 3-prong connector

• 

This manual

• 

4-mm-Allen key required for the fitting of the module

• 

Please save the original packaging. In service cases the original packaging ensures a 
safe shipping and handling. It is also useful for your own transports if you don’t use a 
special housing or rack. 

Recommendations On Module Configuration

Do not place preamp modules in the slot next to the internal power supply to avoid interfer-
ence. If more than three preamp modules are required, we recommend to use the RackPack 8 
frame, model 2710, with external power supply. 

The  tube  module  TwinTube  is  supplied  with  very  high  currents.  Therefore,  two  TwinTube 
modules are the maximum for one RackPack 4 frame. 

Placement

Place the unit on a level and stable surface. The unit’s enclosure is EMC-safe and effectively 
shielded against HF interference. Nonetheless, you should carefully consider where you place 
the unit to avoid electrical disturbances. It should be positioned so that you can easily reach 
it, but there are other considerations. Try not to place it near heat sources or in direct sunlight, 
and avoid exposure to vibrations, dust, heat, cold or moisture. It should also be kept away 
from transformers, motors, power amplifiers and digital processors. Always ensure sufficient 
air circulation by keeping a distance of 4-5 cm/2 inches to other units and to the sides of the 
unit.

Rack Mounting

Be sure that both above and below the machine you maintain a distance of 4-5 cm/2 inches 
in order to eliminate electromagnetic or high frequency interference from other equipment. 
Moreover,  this  will  ensure  adequate  air  circulation  to  prevent  overheating.  Do  NOT  locate 
other  machines  that  produce  excessive  heat  below  the  unit.  The  rear  side  of  the  machine 
should be properly supported – especially when transport is involved.

Hook Up

Summary of Contents for RackPack 4

Page 1: ...Manual 19 3U Mounting Frame for four SPL RackPack Modules RackPack 4 Module Frame Model 1040...

Page 2: ...Mail info spl info Internet www spl info CE Declaration of Conformity The construction of this audio signal processor is in compliance with the stan dards and regulations of the European Community Not...

Page 3: ...odule Configuration 7 Placement Rack Mounting 7 Air Circulation Power Connection Signal Connections On And Off 8 Rear Panel Diagram 9 Fitting Modules 10 Please Note Step 1 Top View 10 Step 2 Rear View...

Page 4: ...ce contact your dealer or a professional electri cian To be sure you have isolated the machine do so by disconnecting the power cord from your wall connection Be sure that the power cord plug is alway...

Page 5: ...ing Warnings DO NOT PLACE THE MACHINE IN SUCH A WAY THAT IT MIGHT COME INTO CONTACT WITH OR SIT ON ANY FLUIDS AVOIDING SUCH CONTACT WILL AVOID HAZARDS FROM FIRE DANGEROUS ELECTRICAL SHOCK OR MACHINE D...

Page 6: ...me reference class results The PreferenceMicPre offers a superior price performance ratio to meet the highest demands in all areas of miking and while a continuous preamp quality is of immea surable v...

Page 7: ...710 with external power supply The tube module TwinTube is supplied with very high currents Therefore two TwinTube modules are the maximum for one RackPack4 frame Placement Place the unit on a level a...

Page 8: ...220 240V In case of doubt please ask your dealer a professional electrician or your local power supplier Before you make or change any power or signal connections turn off all connected devices includ...

Page 9: ...ltage The setting shown here corresponds to operation with 230 V voltage POWER switch The GND LIFT switch eliminates hum by separating the internal ground from the unit s housing ground The switch is...

Page 10: ...d it with further modules Turn off the device before you open it disconnect any power and signal connections and wait at least five minutes to make sure no residual current is left This instruction ex...

Page 11: ...ture use Step 3 Front View Unscrew the two Allen screws socket screws of slot 3 on the front of the RackPack frame with the Allen key and remove the silver decoration panel as well as the blank black...

Page 12: ...t then through the top and bottom holes of the module s front panel Fix the panel and the front of the module by tightening the M4 screws into the threads of the housing Step 5 Finally plug the multi...

Page 13: ...frame The module manuals explain how to configure a module for master or slave mode All modules supporting LINK mode have a 10 pin socket on the top of their circuit board A flat ribbon cable with tw...

Page 14: ...s are also visible through the louvers of the top panel Green LED illuminates 250V current activated Rote LED illuminates Error 250V current deactivated though tube module is present No LED illuminate...

Page 15: ...15 RackPack4 Your Notes...

Page 16: ...RackPack4 Manual RackPack4 Model 1040...

Reviews: