4. Lay the Beam on the Cap.
5. Place the Cross Beam Bracket under the Beam, insert the U-bolt (6) into the holes and through
the Rack Head, connect M10 washers and lock washers ② and Nuts, tighten them lightly.
6. Slide the Beam symmetrical onto the Cap. Makes sure the marked middle of the Beam is in the
middle of the Cap. Place the second Beam Washer under the Beam and mount it as shown in the
picture below:
7. Mount one of the Purlin at a Tilt-angle of 0° The W= Panel’s Width+24mm[0.95 inch]
6. All purlins installed eqaul distance as shown below.
(Three Module SRTP-PM-3)
(Two Module SRTP-PM-2)
10
10
11
11
10
10
11
11
Spire 4 Technologies
|
|
www.spire4.com
Contact
|
Tele : +(605) 593-9565
|
Fax : +(605) 252-5695
Spire 4 Technologies
|
|
www.spire4.com
Tele : +(605) 593-9565
|
Fax : +(605) 252-5695
|
Contact