4 - PLANNING

“RULE OF THUMB” GUIDELINES FOR AVERAGE MOUNTING POLE INSTALLATION:

IT IS THE INSTALLERS RESPONSIBILITY TO VERIFY SOIL CONDITIONS.

SOIL CONDITIONS VARY FROM REGION TO REGION

SOIL CONDITIONS WILL DETERMINE THE ACTUAL DEPTH AND DIAMETER OF THE HOLE AND AMOUNT OF

CONCRETE USED.

IF YOU ARE UNCERTAIN WE RECOMMEND YOU CONSULT A CIVIL ENGINEER IN YOUR AREA WHO IS FAMIL-

IAR WITH LOCAL SOIL CONDITIONS AND WIND

INSTALL MOUNTING POLE SO IT IS RESTING ON THE BOTTOM OF THE HOLE

FILL THE BOTTOM 2” - 4” WITH GRAVEL TO ALLOW WATER DRAINAGE

BRACE THE MOUNTING POLE SO THAT IS PLUMB

FILL THE HOLE WITH CONCRETE, ADDING 2” - 3” ADDITIONAL TO SLOPE AWAY FROM POLE FOR DRAIN-

AGE (FORM WITH TROWEL)

ALLOW THE CONCRETE TO SET FOR A MINIMUM OF 24 HRS BEFORE REMOVING BRACING AND.

INSTALLING RACKING SYSTEM.

Assumptions: The pole extends no more than 6 feet(1.8 meters) above ground, Design 

wind speeds assume 29 psf wind force at 90mph (150km/h) and 51 psf wind force at 120 

mph(200km/h).which correspond to Exposure Category C of the International Building 

Code, terrain that is flat and generally open extending one-half mile(800 meters) or more 

from the site in any quadrant.

4.2 - REQUIRED TOOLS FOR INSTALLATION:

• 6mm, Allen key

• Ring or open end flat spanner, wrench size 17mm

• Socket nut (½”-drive) for wrench size 17mm

• Ratchet spanner ½”

• Torque wrench ½” (needed torque 32 Nm/23.6 Ib-ft)

• Measuring tape 25 ft.

• Marker for steel

• Safety shoes, helmet and safety equipment for lifting and handling steel parts over head

• Oil for the screws

6

6

7

7

6

6

7

7

Tele : +(605) 593-9565

   |

   Fax : +(605) 252-5695  

|

  Contact    

Spire 4 Technologies  

|

  [email protected]

   |

   www.spire4.com

Contact  

|

  Tele : +(605) 593-9565

   |

   Fax : +(605) 252-5695

Spire 4 Technologies  

|

  [email protected]

   |

   www.spire4.com

Summary of Contents for SUN-RAC SRTP-PM-1

Page 1: ...PV MODULE MOUNTING TP SUN RAC LT SERIES INSTALLATION MANUAL FOR 4 0 SCH 40 REV1 120518...

Page 2: ...AGE 8 10 5 5 ADJUSTMENT OF ANGLE OR ARRAY PAGE 11 The SUN RAC system is the fastest most cost effective top of pole mounting system we have used I wish this racking solution was available years ago It...

Page 3: ...e of the modules will reduce the likelihood of high snow thickness ALL WARRANTY CLAIMS AGAINST SUN RAC ARE INVALID IF THE SRTP PM X IS INSTALLED IN INAPPROPRIATE CONDITIONS 2 ADDITIONAL INSTALLATION I...

Page 4: ...ACING AND INSTALLING RACKING SYSTEM Assumptions The pole extends no more than 6 feet 1 8 meters above ground Design wind speeds assume 29 psf wind force at 90mph 150km h and 51 psf wind force at 120 m...

Page 5: ...idth W 2 Write down the number of PV Modules you want to mount N 3 Calculate the Beam length L1 EXAMPLE Number of PV Modules N _____________ Width of the PV Module W ____________ L1 ___________IN N X...

Page 6: ...iddle of the Cap Place the second Beam Washer under the Beam and mount it as shown in the picture below 7 Mount one of the Purlin at a Tilt angle of 0 The W Panel s Width 24mm 0 95 inch 6 All purlins...

Page 7: ...er end of the Rail and the Pole Please Measure from the edge shown below edge on the Rail to the Pole Adjust angle by loosening u bolts through the top cap The tilt adjustment for the northern hemisph...

Page 8: ...s beam or main pole Shipping Weights Dimensions Model Shipping Weight Box Dimensions SUN RAC SRTP PM 1 18 lbs 36 in x 10 in x 10 in SUN RAC SRTP PM 2 21 lbs SUN RAC SRTP PM 3 23 lbs SUN RAC SRTP PM 4...

Page 9: ...Simply Energy 2016 All Rights Reserved...

Reviews: