![Spirax Sarco M33 ISO Series Installation And Maintenance Instructions Manual Download Page 12](http://html1.mh-extra.com/html/spirax-sarco/m33-iso-series/m33-iso-series_installation-and-maintenance-instructions-manual_1347939012.webp)
IM-P133-65
CMGT Issue 2
12
6.4 How to replace the upper stem packing:
-
Observe the 'Safety information' in Section 1.
Warning:
Isolate the ball valve both upstream and downstream and wait for the unit to reach ambient
temperature before handling.
-
Remove the gland nut (
13
).
-
Replace the upper stem packing (
9
).
-
Reassemble the unit and tighten the gland nut (
13
) to the recommended torque, see Table 1.
Please note -
If leakage is observed through the stem, after 24 hours in service, it may be stopped by
retightening the gland nut (
13
) to the recommended torque, see Table 1.
Table 1 Recommended tightening torques
Part
Size
N m
(lbf ft)
ASME 150
ASME 300
ASME 150
ASME 300
Studs (19) and
Nuts (20)
DN50
60
140
44
103
DN65
60
220
44
162
DN80
60
220
44
162
DN100
140
140
103
103
DN150
140
220
103
162
DN200
350
350
258
258
Gland nut (13)
DN50
30 - 40
22 - 30
DN65
54 - 61
40 - 45
DN80
54 - 61
40 - 45
DN100
76 - 90
56 - 66
DN150
196 - 216
145 - 159
DN200
196 - 216
145 - 159
Summary of Contents for M33 ISO Series
Page 15: ...IM P133 65 CMGT Issue 2 15...