1
Table of Contents
Record of Revision and Approvals
3
1. Installing your Spider 6
4
1.1. Positioning the Spider 6
4
1.2. Power
5
2. Normal Operation
6
2.1. Initial Start Up
6
2.2. GPS Lock
6
2.3. First position point sent
6
2.4. SOS
6
2.5. Watch
7
2.6. Mark
7
2.7. Adjusting the Keypad LED Brightness
7
2.8. Spidertxt
7
3. Troubleshooting
8
3.1. Loss of Power
8
3.2. GPS loss
8
3.3. Satellite LED turns off
8
Appendix
9
(A) Spider 6 Minor Modification Summary Report
10
(A)1. Description
10
(A)2. Modification Approval Basis
10
(A)3. Configuration Control Data
10
(A)4. Post Installation Testing
10
(A)5. Operation and Limitations
10
(A)6. Weight and Balance
10
(A)7. Electrical Load
11
(A)8. Continuing Airworthiness
11
(B) Spider 6 Structure Test Procedure
12
(B)1.Test Definition
12
(B)2.Special Tools and Equipment
12
(B)3.Test Conditions
12
(B)4.Applied Loads
12
(B)5.Test Procedure
12
(B)6.Pass/Fail Criteria
13
(B)7.Test Record
13
Summary of Contents for Spider 6
Page 10: ...9 Appendix...
Page 22: ...21 D Wiring Diagram Power Lead...