![SPIDER 2SGS EFI Operation Manual Download Page 24](http://html1.mh-extra.com/html/spider/2sgs-efi/2sgs-efi_operation-manual_1347287024.webp)
Operation Manual
–
Spider 2SGS EFI
24 / 55
rev. 01-01-02-2021
9. PREPARING THE MACHINE
9.1 MACHINE DELIVERY TO A DEALER OR
RETAILER
From the manufacturer the machine is
•
Before driving down from the pallet raise the
delivered filled with engine oil and Hydraulic
oil but without gasoline in the
tank.
The training of the operator should take place during the
installation of the product.
To take the mower off the pallet/crate:
•
Place the palette with the mower on a level surface
•
Carefully remove the upper boards of the crate and
mowing mechanism to the upper position (this can be
done without starting the engine)
•
Place boards in front of the wheels in the direction,
in which you expect to drive the mower from the pallet
to the ground. Put at least 5 liters/1.2 gallon of fuel to
the tank and attach cables onto the battery. While
starting, follow instructions in chapter 5.
•
The aerial must be attached to the mower
•
After starting the engine set the speed controller on
the transmitter to the (L)/turtle symbol
– lower driving
speed
take out all accessories & the remote c o n t r o l .
•
Slowly move the f o r w a r d /reverse joystick to
Disassemble the side boards of the crate
•
Release the attachment fastening the mower to the
pallet, remove transportation wrapping. Recycle these
wraps.
•
Thoroughly examine the mower for possible
damage and missing parts from the delivery. If
correspond with the direction you want to move the
mower. The arrow on the wheel legs indicates forward.
•
Slowly drive down to the ground and stop the engine
necessary, contact the transporting company with
•
While unpacking, assembling and preparing the
your claim.
mower, do not engage the mower blade
If you have a lifting device with a sufficient lifting capacity available, place the lifting
hooks/eyes on spots marked with the symbols of chain, lift the load by about 0.15 m / 6 inches,
move the pallet away from the mower and lower the machine to the ground.
There may not be enough fuel in the fuel system when starting for the first time and you may
need to repeat the starting several times. Starting period must not exceed 3 seconds. There must be a
pause of at least 20 seconds between all attempts to start the engine
.
Parts of delivery:
•
SPIDER mower
•
Mower ignition key
(2×)
•
Gel battery (12V starting)
•
Remote control including 2 batteries
•
Remote control battery charger (12V
– 7.2V)
•
Operation manual
•
Radio controller key
(2×)
•
Engine user’s and maintenance manual
•
Copy of the EC declaration of conformity
•
Copy of the EC declaration of conformity for Remote controller NBB