Speed Queen ADE41F Installation Instructions Manual Download Page 9

© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT

9

512100

Step 3: (Gas Dryer Only) Connect Gas 
Supply Pipe

1. Make certain your dryer is equipped for use with 

the type of gas in your laundry room. Dryer is 
equipped at the factory for 

Natural Gas

 with a 

3/8 inch NPT gas connection.

NOTE: The gas service to a gas dryer must 
conform with the local codes and ordinances, or in 
the absence of local codes and ordinances, with the 
latest edition of the National Fuel Gas Code ANSI 
Z223.1/NFPA 54 or the CAN/CSA-B149.1 Natural 
Gas and Propane Installation Code.

Natural Gas

, 1000 Btu/ft

3

 (37.3 MJ/m

3

) service must 

be supplied at minimum 5.0 inch water column 
pressure to maximum 10.5 inch water column 
pressure.

For proper operation at altitudes above 3000 feet 
(915 m) the natural gas valve spud orifice size must be 
reduced to ensure complete combustion. Refer to 

Table 2

.

2. Remove the shipping cap from the gas 

connection at the rear of the dryer. Make sure you 
do not damage the pipe threads when removing 
the cap.

3. Connect to gas supply pipe. 

NOTE: When connecting to a gas line, an 
equipment shut-off valve must be installed within 
6 feet (1.8 m) of the dryer. An 1/8 in. NPT pipe plug 
must be installed as shown for checking inlet 
pressure. Refer to 

Figure 5

.

To reduce the risk of gas leaks, fire or 
explosion:
• The dryer must be connected to the type 

of gas as shown on nameplate located in 
the door recess.

• Use a new flexible stainless steel 

connector.

• Use pipe joint compound insoluble in L.P. 

(Liquefied Petroleum) Gas, or Teflon tape, 
on all pipe threads.

• Purge air and sediment from gas supply 

line before connecting it to the dryer. 
Before tightening the connection, purge 
remaining air from gas line to dryer until 
odor of gas is detected. This step is 
required to prevent gas valve 
contamination.

• Do not use an open flame to check for gas 

leaks. Use a non-corrosive leak detection 
fluid.

• Any disassembly requiring the use of 

tools must be performed by a suitably 
qualified service person.

W316

WARNING

Natural Gas Altitude Adjustments

Altitude

Orifice Size

Part No.

feet

m

No.

inches

mm

3000

915

43

0.0890

2.26

503778

6000

1830

44

0.0860

2.18

58719

8000

2440

45

0.0820

2.08

503779

9000

2740

46

0.0810

2.06

503780

10,000

3050

47

0.0785

1.99

503781

Table 2 

D233I

1

New stainless steel flexible connector–
(Use design CSA certified connector)
Use only if allowed by local codes 

2

1/8 in. NPT Pipe Plug

3

Equipment Shut-Off Valve

4

Black Iron Pipe 
Shorter than 20 ft. (6.1 m) – 
Use 3/8 in. (9.5 mm) pipe
Longer than 20 ft. (6.1 m) – 
Use 1/2 in. (12.7 mm) pipe

5

3/8 in. NPT Gas Connection

Figure 5 

D233I

1

3

2

4

5

Summary of Contents for ADE41F

Page 1: ...chine www speedqueen com Installation Instructions for Front Control Dryers Dimensions 3 Before You Start 4 Installing the Dryer 5 Installer Checklist Back Cover Date Purchased _____________________ M...

Page 2: ...qualified installer service agency or the gas supplier W052 FOR YOUR SAFETY the information in this manual must be followed to minimize the risk of fire or explosion or to prevent property damage pers...

Page 3: ...6 cm 4 0 in 10 2 cm 26 9 in 68 3 cm ELECTRIC DRYERS 8 0 in 20 3 cm 15 4 in 39 1 cm 15 44 in 39 2 cm 37 44 in 95 1 cm DRY2344N With leveling legs turned into base 1 3 8 in NPT Gas Connection DRY2344N...

Page 4: ...ctions User s Guide Product Registration Card Dryer Rack Reply Card Warranty Bond Three screws electric dryers only Refer to Connecting Power Cord sections in Step 4 of Installation DRY2023N 1 Safety...

Page 5: ...68N 1 Closet Door 2 Centered Air Openings 2 Openings minimum 3 Outer Wall of Enclosure NOTE For new installations locate top of wall vent 42 inches 106 7 cm above floor to make venting easier to conne...

Page 6: ...op rivets on all duct joints DO NOT use sheet metal screws or fasteners on exhaust pipe joints which extend into the duct and catch lint DRY2345N 1 Dryer Base 2 Level 3 Leveling Leg 1 2 3 To reduce th...

Page 7: ...ergy efficient homes with low air infiltration rates should be equipped with an air exchanger that can accommodate on demand make up air needs in the home These devices can be obtained through your bu...

Page 8: ...be necessary for installations where heavy snowfall can occur Table 1 NOTE The maximum length of a 4 in 10 2 cm diameter flexible metal duct must not exceed 7 87 ft 2 4 m as required to meet UL2158 cl...

Page 9: ...installed as shown for checking inlet pressure Refer to Figure 5 To reduce the risk of gas leaks fire or explosion The dryer must be connected to the type of gas as shown on nameplate located in the d...

Page 10: ...iagram is located behind the control panel inside the control cabinet Grounding Information This appliance must be grounded In the event of malfunction or breakdown grounding will reduce the risk of e...

Page 11: ...Do not connect dryer to 110 115 or 120 Volt circuit Heating elements are available for field installation in dryers which are to be connected to electrical service of different voltage than that list...

Page 12: ...30 Ampere Fuses or Circuit Breaker 6 Neutral 3 Neutral Wire 7 Terminal Block in Dryer NOTE The power cord is NOT supplied with the electric dryer Type of power cord and gauge of wire must conform to l...

Page 13: ...t Use an acceptable indicating device connected to the center grounding pin of the plug and the green screw on the back of the cabinet 8 Reinstall access cover and screw Connecting Power Cord with Fou...

Page 14: ...the white wire loop the free eyelet end of the ground wire removed in Step 3 and attach along with the white wire to the neutral center terminal on the terminal block 7 Tighten all screws firmly IMPOR...

Page 15: ...en pull down removing door liner from door panel 4 Rotate door panel 180 degrees as shown 5 Remove door strike from door liner and reinstall on opposite side 6 Insert liner under flange on bottom of d...

Page 16: ...operate both a washer and gas dryer on the same circuit Use separately fused 15 amp circuits The dryer is designed to be operated on a separate branch polarized three wire effectively grounded 120 Vol...

Page 17: ...efer to Installer Checklist on the back cover of this manual and make sure that dryer is installed correctly Step 9 Check Heat Source Electric Dryers Close the loading door and start the dryer in a he...

Page 18: ...Adjust the air shutter to obtain a soft uniform blue flame A lazy yellow tipped flame indicates lack of air A harsh roaring very blue flame indicates too much air Adjust the air shutter as follows 1...

Page 19: ......

Page 20: ...EVEL D255I D255I 2 DRY688N DRY688N Connect Dryer Exhaust System CHECK 3 GAS ONLY D258I CHECK Connect Gas Supply Pipe Check for Gas Leaks 4 D699I W315IE0A ELECTRIC ONLY Connect Electrical Cord CHECK Re...

Reviews: