background image

0103148R8 Page 6 of 11

Floor anchoring (Toe Kick versions only)

1. 

If your Media Director is equipped with a toe kick, and you wish to attach it to the floor, the toe-kick 

will need to be detached from the lectern. To detach, open the doors and remove the (4) 1/4-20 x 

40mm JC bolts (one on each corner) from inside the lectern.  

Figure 4A

.  (Save these fasteners).

2.  Carefully lift the lectern off the toe kick and set aside. This will require several people.  

Figure 4B

.

3. 

Determine and locate the toe kick into its final position on the floor and mark the (4) mounting hole 

locations on the floor.  (The toe kick mounting holes are 1/2” dia.)

4. 

Drill suitable holes into the floor and anchor the toe kick with appropriate fasteners.

5.  Carefully lift the lecternt back onto the toe kick and align the (4) mounting holes.

6.  Re-attach the lectern to the toe kick with the previously removed JC bolts.

7.  The access panel can be removed to access wiring below the cart.

Figure 4B

Note: (4) fasteners are required to anchor the 

toe kick to the floor.  Due to the wide variety 

of flooring materials and conditions possible, 

anchor fasteners are not provided.

(4) 1/2” [1.27 cm]

Mounting holes for 

floor anchors

1/4-20 x 40mm JC bolt

(access from inside lectern)

4 required

Access panel

Toe kick

Tools

 

Required

4mm Hex 

wrench

(included)

Drill

Figure 4A

1/4-20 x 40mm 

JC bolts

Lectern

Summary of Contents for Media Director V2 Lectern 55259

Page 1: ...r if you have any questions please contact us Thank you for purchasing Spectrum products Spectrum Industries Inc 925 First Avenue Chippewa Falls WI 54729 USA 800 235 1262 715 723 6750 www spectrumfurn...

Page 2: ...re each use Do not use power cords that are damaged Unplug power cord from electrical outlet by gripping the cord Do not unplug the power cord by pulling only on the cord Do not step on drive over dra...

Page 3: ...saligned a slight adjustment can be made to the bottom hinge side of the door Figure 2B 1 Using the quick release lever remove the door 2 Set the removed door on a non abrasive worksurface 3 Slightly...

Page 4: ...Drill Pencil Masking tape Drill bit Measuring device 1 To remove the overbridge insert panel remove the 2 1 4 20 x 35mm JC bolts with a 4mm hex wrench and lift out the panel Figure 3A 2 To make cutou...

Page 5: ...insert panel is horizontally symmetrical and can be easily removed rotated and re installed if a cutout needs to be relocated to the opposite side of the overbridge Note The Overbridge Control Console...

Page 6: ...on the floor The toe kick mounting holes are 1 2 dia 4 Drill suitable holes into the floor and anchor the toe kick with appropriate fasteners 5 Carefully lift the lecternt back onto the toe kick and a...

Page 7: ...2 Hook the keyboard slide track into one of the pre installed clips under the left or right side of the worksurface Figure 6 3 Align the mounting holes with the pre drilled worksurface holes 4 Attach...

Page 8: ...lever Figure 8 2 To resume operation lift up on brake lever 0103148R8 Page 8 of 11 Moving and parking the lectern Before moving unplug and secure all power cords Close and lock doors Remove any items...

Page 9: ...55263 Steel Handle mounts on left or right side max two per unit 55265 Upper Rack Rail Kit 3RU max 2 per unit 55266 Pull Out Drawer 18 813 W x 15 25 D x 3 125 H max 1 per unit 55264 Adjustable Econo...

Page 10: ...6507mod panel with cutout s Non Slip CPU Pad 11 W x 23 D 95518 Custom Cut Logo Panel audience side 55261 Security Panel 55262 Cove Power Module Kit with mounting plate 9 power cord 2 AC outlets 2 USB...

Page 11: ...THE PURCHASE PRICE RECEIVED BY SPECTRUM FOR THE PRODUCT AT ISSUE AND RECALLACTION EXPENSES SPECTRUM SHALL NOT BE SUBJECT TO ANY OTHER OBLIGATIONS OR LIABILITIES WHETHER ARIS ING OUT OF BREACH OF CONT...

Reviews: