
Spectron Gas Control Systems GmbH
Dismantling and disposal | 10
GES_FS4_0520
49
The dismantling process is to be carried out in the following order:
1. Decommissioning the controller
2. Disconnect the controller from the power supply
3. Disconnect the controller from the control air supply
4. Pack the control.
10.2 Disposal
Dismantling and disposal must be carried out in accordance with the official and legal require-
ments at the site of the system. The operator must produce a risk assessment and work instruc-
tions before dismantling. A piece of equipment may only be disposed of when the decontamina-
tion declaration (
https://www.spectron.de/sites/default/files/2020-08/Declaration%20of%20de-