5 | Installation
Spectron Gas Control Systems GmbH
16
G56-SP_0520
5.2.2 Connecting the incoming and outgoing lines
All lines must be connected in accordance with the applicable standards and specifications and
tested with purge gas (pressure test and leak test). The specifications on dimensioning of the
connections are described in the "