SpectraPure
®
SpectraPure
®
Inc.
480.894.5437 Call us toll-free 1.800.685.2783
2167 East Fifth St, Tempe, Arizona 85281
7
SETUP PROCEDURES
STEP 1: Connect the 1/2" Black Line to a cold water line that will provide unrestricted water flow
to the RO/DI system.
STEP 2: PURE WATER FLUSH CYCLE INSTALLATION USING THE HIGH AND LOW FLOAT SWITCHES.
A. Install both the High and Low Floats onto an open container.The floats can be mounted
by drilling a 5/8" hole. (The High Float shuts down the system, while the Low Float
turns the system on).
B. Connect the floats to the “Y” adapter.
C. Attach the 3-pin connector on the float switches to the UHE CONTROL MODULE.
NOTE: Floats are to be mounted horizontal when dry and float up when wet. In most
instances we recommend locating the low float approximately halfway down your
reservoir. DO NOT OVERTIGHTEN when installing the floats.
NOTE: Floats must be installed in a DI WATER storage container. This system MUST
be connected to the floats to operate the Flush Cycle. Failure to install the pure
water flush connection for this unit will void any warranty.
STEP 3: For now, direct both the 3/8" blue (product) line and the 3/8" yellow (waste) line to drain.
STEP 4: Open the cold water (tap water) feed that is connected to the black line. Plug in the 115/230
VAC power cord to the AC power source.
STEP 5: At this stage, the system will start producing water from the 3/8" blue and 3/8" yellow lines.
Discard that water for approx. 15 -20 min.
(continued on next page)