background image

 

 

Exploring your Test Monitor 

 

 

 

 

 

 

 

System indicator 

Green light: Power on 

 

Red light: Charging 

 

Green light winking: Sleep mode 

 

Light sensor   

Auto adjusting back light 

 

Source   

Switch AUTO / TVI / AHD input

 

Direction   

Up / Down / L / R direction for select options 

 

Menu   

Entry Menu to adjust detail.

 

Sleep mode

 

 

Turn on / Off the back light 

 

Power switch

 

Turn on / off the power 

 

 

 

 

 

 

 

Summary of Contents for VMST7

Page 1: ...battery before using Thank you for purchasing our product Speco Technologies is constantly developing and improving products We reserve the right to modify product design and specifications without n...

Page 2: ...organic solution or the corrosively sanitizer to insert and wipe away the chassis outside While inserting and wiping away please turn off the power and use the clean cloth is stained with letting a sm...

Page 3: ...3 Components 1 7 LCD CCTV Test monitor 2 Power cord 3 Power supply cable for camera 4 Audio cord 5 Storage Bag 6 Quick guide 7 battery...

Page 4: ...ight Charging Green light winking Sleep mode Light sensor Auto adjusting back light Source Switch AUTO TVI AHD input Direction Up Down L R direction for select options Menu Entry Menu to adjust detail...

Page 5: ...Led light Flashlight stand Easy for using on desk Power input DC 12V 2A for charge Power output DC 12V 500mA supply temporary power for camera Audio input Test sound from camera Cable test Cable open...

Page 6: ...menu as below System will go to standby mode to save power automatically when no input OFF 5 10 30 60 min can be selected A light sensor is a device that is used to detect light and automatically cont...

Page 7: ...ult Input PTZ If camera available Click Menu twice twice to enter Default Input PTZ function Click Menu twice to enter PTZ Menu Camera OSD menu To control Tele Wide Far Near Change Default Input AUTO...

Page 8: ...8 Test Function and Operation Press or button to switch function and or to select more options 1 CABLE TEST Open or Short circuit testing...

Page 9: ...AL H GRAY PAL V GRAY PAL H RAMP 4 AUDIO IN ON OFF 5 LED OFF LOW MIDDLE HIGH Notice 1 When you first time to start using the test monitor please charge battery above 5 hours to make sure this battery i...

Page 10: ...harge status Charge independently is better for battery life and fast short battery charger time In addition Charge voltage should not be below 2A Dimension Specifications Panel Size 7 TFT LCD Caution...

Page 11: ...Output Output the color bar pattern to test display Cable Test Test cable open short Charging Voltage Current DC 12V 2A Battery 7 4V 3400mAh Li ion Battery Pack Accessories Storage Bag Power cord Powe...

Reviews: