background image

 

Overview 

 
 
 

Junction box cotton pad 

                                                                                   

M20 Plastic Screw 

 
 
 
 

Junction box

 

 
 
                                                                                   

Water-proof 

rubber ring 

 
 
 

Junction box upper cover 

                                                                               

KM4*10 threaded 

screws 

                                                                                     

 

Installation 

1

 

 
 
 
 
 

2

                                                                                   

 

 

 

 

 

3

 

 
 
 
 
 
 

4

 

 
 
 
 
 
 

5

 

 
 
 
 
 
 
 
 

6

 

 
 
 
 
 
 
 

1

Drill installation holes according to drawing paper

then stuff into rubber stoppers

 

2

Paste  cotton  pad  onto  the  bottom  of  junction 

box

then push the water-proof rubber ring onto the 

upper body of junction box

 

3

Use 3pcs PWA4*25 self-tapping screws to fix 

junction box body

 

4

Use  3pcs  KM4*10  threaded  screws  to  fix 

the upper cover with the junction box body

 

5

Disassemble  the  dome  base

  put  the 

cotton  pad  onto  the  upper  cover

then  use 

4pcs  PM4*12  screws  to  fix  the  dome  base 

with the junction box

 

6

Connect all cables and 

put them into the junction 

box

  then  install  the 

dome with the dome base 

well

  then use the dome 

ring to fix

 

 

Reviews: