
Operating Instructions
10/2010
1096.0799 | VU / VH Series
41
9.2.6 Operating
connections
Type
Process water connection
Suction connection
Pressure connection
Size
Shape
Size
Shape
Size
Shape
VU 20/40
VH 20/40/60
G 3/8“
Thread
G 1 1/4“
Thread
G 1 1/4“
Thread
VU 80/140
VH
110/140/180
G ½“
Thread
DN 40
Flange
DN 40
Flange
VU 220
G ½“
Thread
DN 50
Flange
DN 50
Flange
VU 300
VH
300/350/400
G 1“
Thread
DN 50
Flange
DN 50
Flange
VU 351/451
G ¾“
Thread
DN 65
Flange
DN 65
Flange
VU 450
VH 500/600
G 1“
Thread
DN 65
Flange
DN 65
Flange
VU 500/600
G 1“
Thread
DN 100
Flange
DN 100
Flange
VU 800/1200/
1600
VH 800/1200/
1600
G 2“
Thread
DN 100
Flange
DN 100
Flange
Tab. 24 Operating connections
9.2.7 Mechanical
seal
All pumps offer mechanical seals with integrated flush.
Typical features are
single
seal
unbalanced
conical
spring
dependent on the direction of rotation
Special versions
double-acting mechanical seals
cartridge
units
packing
glands
9.2.8 Ambient
conditions
Operation under other ambient conditions has to be agreed
with the manufacturer.
Temperature
[°C]
Relative humidity [%]
Set-up
altitude
above sea
level [m]
long-term
short-term
+5 to +40
≤
85
≤
100
≤
1000
Tab. 25 Ambient conditions
9.2.9
Clearances for heat dissipation
Type
Min. clearance fan hood –
adjacent surface [mm]
VU 20/40
VH 20/40/80
35
VU
80/140/220/300/351/
450/451/500/600/800
VH 110/140/180/300
350/400/500/600
55
VU 1200
VH 800/1200
75
VU/VH 1600
100
Tab. 26 Clearances for heat dissipation