INSTALLATION AND ASSEMBLY
1.
Please check all the items against the parts list after opening the box. Only all the items are
complete, the installation could be followed.
2.
Installation:
Operation
*Turn on the ON/OFF button first.
CLEANING AND MAINTENANCE
1.
Always turn off and unplug the heater before cleaning.
2.
To clean the heater, use a damp cloth and make sure to dry excess water once cleaned.
*ATTENTION Do not put the heater directly into any container with water in it.
IP55 Dust and Water Protection
To comply with European Directive 2002/96/EC concerning old electric and electronic equipment and its
implementation in national laws, old electric tools have to be separated from other waste and disposed of in an
environment-friendly fashion, e.g. by taking to a recycling deport.
TROUBLE SHOOTING
1.
If the heater does not emit heat after turning on, please check the power cord whether
plugged into electric socket properly.
2.
In first use, it is normal if the heater appears small amount of smoke and some smell
because of protective-oil evaporation.
Imported by N Brown Group plc, Griffin House, 40 Lever Street, Manchester, M60 6ES, United Kingdom.
TOUCH
FIRST
SECOND
THIRD
FOURTH
FIFTH
OUTCOME
STANDBY
900W
1200W
2100W
OFF
5
2
1
3
1.
Using 3 bolt to tighten the base and Down-pole by wrench.
2.
Place the decorative cap on the base.
3.
Tighten up the Up-pole and Down-pole by hand.
4.
Put the heater head as the illustration and fix it by 2 tapping screws.
5.
Feed the power cord through all the poles and base and connect to
heater head. Secure the power cord to the weighted base.
4
ON/OFF BUTTON
TOUCH SWITCH
Press and Cycle by 900W-1200W-2100W