Prepare to Power Off the Server
Step
Description
Links
“Power Off the Server (Server Power Button -
“Power Off the Server (Emergency
3.
Disconnect the power cords from the server.
“Disconnect Power Cords” on page 53
Related Information
■
“Front Panel Components with Eight Drives” on page 11
Prepare to Power Off the Server
Perform this procedure before powering off the server.
1.
Log in as superuser or equivalent.
Depending on the type of problem, you might want to view server status or log files. You also
might want to run diagnostics before you shut down the server.
2.
Notify affected users that the server will be shut down.
Refer to the Oracle Solaris system administration documentation for additional information.
3.
Save any open files and quit all running programs.
Refer to your application documentation for specific information on these processes.
4.
Shut down all LDoms.
Refer to Oracle Solaris system administration and Oracle VM Server for SPARC documentation
for additional information.
5.
Shut down the Oracle Solaris OS.
Refer to the Oracle Solaris system administration documentation for additional information.
Related Information
■
“Power Off the Server (Server Power Button - Graceful)” on page 52
■
“Power Off the Server (Emergency Shutdown)” on page 53
■
“Front Panel Components with Eight Drives” on page 11
Preparing for Service
51
Summary of Contents for S7-2L
Page 1: ...SPARC S7 2L Server Service Manual Part No E73201 04 March 2017...
Page 2: ......
Page 10: ...10 SPARC S7 2L Server Service Manual March 2017...
Page 26: ...26 SPARC S7 2L Server Service Manual March 2017...
Page 44: ...44 SPARC S7 2L Server Service Manual March 2017...
Page 61: ...Remove the Fan Cover Use a T6 Torx screwdriver Preparing for Service 61...
Page 64: ...64 SPARC S7 2L Server Service Manual March 2017...
Page 76: ...76 SPARC S7 2L Server Service Manual March 2017...
Page 86: ...86 SPARC S7 2L Server Service Manual March 2017...
Page 156: ...156 SPARC S7 2L Server Service Manual March 2017...