SECTION 1: INTRODUCTION
SpacePak System Design ................................... 2
Code Compliance ................................................ 2
Air Distribution Requirements ............................... 2
Air Distribution Components................................. 3-5
Shipment of Unit .................................................. 5
SECTION 2: SYSTEM INSTALLATION
Step 1: Locating The Unit.................................... 5
Step 2: Cutting Return Air Opening..................... 8
Step 3: Attaching Supply Air Plenum Adaptor ..... 9
Step 4: Setting The Unit ...................................... 10
Step 5: Connecting Water Lines.......................... 11
Step 6: Installing The Condensate Trap & Line... 11
Step 7: Wiring The Unit .......................................11-12
Step 8: Installing Air Distribution Components ....13-19
Step 9: B & C Series Retrofits.............................17-19
SECTION 3: START UP & OPERATION
Sequence Of Operation....................................... 19
Prior To Start-Up.................................................. 19
System Start-Up & Adjustments .......................... 19
Operating Setpoints.............................................21-23
Factors Affecting the Balance of the System....... 24
SECTION 4: MAINTENANCE
Yearly Maintenance Checklist.............................. 25
If System Fails To Operate .................................. 25
Service/Troubleshooting Form............................. 26
Parts List.............................................................. 27
Warranty Information ........................................... 28
IN UNITED STATES: 260 NORTH ELM ST. WESTFIELD, MA 01085 (413) 564-5530/FAX (413) 564-5815
IN CANADA: 7555 TRANMERE DRIVE, MISSISSAUGA, ONTARIO, L5S 1L4 (905) 670-5888/FAX (905) 670-5782
Central Hydronic Coil Series
2 to 5 Tons
Fan Coil Unit/Air Supply
Components
MODEL
WCSP-J SYSTEM
INSTALLATION,
OPERATION
& MAINTENANCE
MANUAL
WCSPJ2-0417
45W30-WG0845