Form 44201360
17
Oct 2019
It is recommended that two people lift the heater out of the carton. Do not remove from the
remaining packaging until the heater is ready to be hung.
INSTALLATION
12.0)
In order to protect the ceramic glass it is recommended to only insert the ceramic glass once all the other
installation steps have been completed. The ceramic glass must be removed to wire the heater and for
commissioning.
Various means of suspending the heater can be used.
a)
Heaters installed outdoors or in areas subject to strong winds must be installed using the optional hanging
brackets or suitable rigid mount hardware. Chain, cable and other flexible hanging methods are not
recommended.
b)
Use only noncombustible materials for suspending hangers and brackets.
c)
Turnbuckles can be used with chains to allow leveling of the heater. All “S” hooks and eye bolts must be
manually crimped closed by the installer.
d)
Heaters must not be supported by gas or electric supply lines and must be suspended from a permanent
structure with adequate load capacity.
e)
Hanging points are a fixed length between centers. Secondary steel work may be required to span between
supporting beams.
f)
The appliance should be located with respect to building construction and other equipment to permit
access to the appliance for servicing etc.
f)
The heater must be installed in an adequate free area to allow the products of combustion to freely escape
from the heater. The heater must not be installed in recessed spaces or enclosure and alcoves.