![Spa Builders AP-4 SYSTEM Owner'S Operation Manual Download Page 7](http://html1.mh-extra.com/html/spa-builders/ap-4-system/ap-4-system_owners-operation-manual_1338743007.webp)
6
SURFACE AND PAD REQUIREMENTS
1.
Your new spa
must be placed on a uniformly firm and level surface
. The pad
foundation recommended is a concrete pad at least 4 inches thick. As an alternative,
a pea-gravel foundation pad could be used, but it must be on a firm, level base and it
must be contained in a secure wood or concrete restraining border so that the loose
gravel can not shift once the spa is in place. If a concrete pad is poured, this is the
logical time to “plumb-in” your electrical conduit. Be sure the concrete has cured for
at least one week before setting the spa in place. A typical spa, filled with water,
could weigh as much as two and a half tons and if the concrete is not fully cured, it
could easily crack.
An uneven or cracked concrete pad or the use of shims of any
kind may cause the spa to buckle, distort and/or crack. If this being the case, the
warranty on your spa will be void.
2.
If your spa is located near water sprinklers, adjust the cap on them so water will not
hit the wood siding of the spa.
3.
Balconies and decks must be constructed to current state and local codes to safely
support the maximum load of your water filled spa and the number of people using
the spa. Check with your construction contractor for these specifications. Balconies
and decks must support at least 75 pounds per square foot.
4.
Gates must be self-closing and self-locking. Check your local codes regarding fences
and gates.
5.
It is the responsibility of the owner to provide clear access on all sides of the spa once
it is set in place for ease in repair, otherwise, additional costs to service and repair the
spa will be incurred.
INSTALLATION CONSIDERATIONS
It is highly recommended that the owner/user of this spa carefully read all instructions in
this manual prior to having your spa installed at your chosen location, whether indoors or
outdoors
. Improper installation may result in equipment damage and will void the
warranty.
SURFACE AND PAD REQUIREMENTS
Summary of Contents for AP-4 SYSTEM
Page 1: ......