background image

 

CONTENTS 

Introduction 

 

 

 

 

 

 

 

 

 

 

Parts Diagram 

 

 

 

 

 

 

 

 

 

 

Operation Steps   

 

 

 

 

 

 

 

 

 

Warning - Maintenance   

 

 

 

 

 

 

 

            3 

Warranty Details   

 

 

 

 

 

 

 

 

            4 

 

INTRODUCTUCTION 

 

For Hand Held refractometer 

 

Parts Diagram: 

 

Operation Steps: 

Step1. 

Open daylight plate, and place 2-3 drops of distilled water on the main prism. 

Close the daylight plate so the water spreads across the entire surface of the 

prism without air bubbles or dry spots. Allow the sample to temperature adjust 

on the prism for approximately 30 seconds before going to step 2. This allows 

the sample to adjust to the ambient temperature of the refractometer. 

 

Step2. 

Hold daylight plate in the direction of a light source and look into the eyepiece. If you will see a 

circular field with graduation down  

the entrance, you may have to focus 

the eyepiece to clearly see the 

graduation. The upper portion of the 

field should be blue, while the lower 

portion should be white. (The pictures 

shown here and shown in step3 &  

step4 are only as reference. The right  

specific scale is listed the products.) 

 

 

 

Reviews: