9.4 ROAD STAKE-OUT
Please confirmed that the station has been set,
also the horizontal and vertical alignment has
been defined correctly before stake-out.
[ADD]
: Add a new element of vertical alignment.
Pile
: The pile ID of changing point
Ht
: The height of changing point
Front V%
: The vertical slope between current
point to the last point.
Back V%
: The vertical slope between current
point to the next point.
R
: The radius, distance between two points.
☞
Input the parameter of vertical elements