FPS-650 and FPS-1250 South-Tek Systems
Version:
7
Revision Date: 9/6/19
Page 17 of 29
AIR BYPASS SETUP (OPTIONAL)
The Air Bypass Option ensures that nitrogen is the only supervisory gas
entering the FPS. It safeguards your installation all while providing piece of
mind knowing the FPS is being filled with nitrogen vs any other gas. It will
alarm if the N2-Blast Generator is being bypassed by the air compressor. It
safeguards against a maintenance technician from inadvertently leaving the
“air bypass” open or the N2-Blast being powered in the off position. It will
provide a visual alarm when it is in alarm mode. See wiring diagram and
installation drawing included with this package. For electronic copies, please
contact your local distributor.
START-UP PROCEDURES
It is necessary to use caution when working with pressurized gas, making
sure that all fittings and gas lines are installed correctly. Always leak check
(see
section) every line before using the system.
Note: Line leaks will cause the
N
2
-BLAST
®
to run excessively, shortening
its life and cause excess wear on the compressor.
The installation layout drawings are provided with your system in the
documentation package of the system. For electronic copies, please contact
your local distributor. Review and make sure the setup installation is
completed per the installation layout drawings. Ensure that you follow the
correct installation drawing per your system’s design. In some cases, a N
2
Bypass system for pre-filling is required in the installations to meet code.
If your system requirements are more complex, please consult your sales
representative or equipment installer for more detailed installation
instructions.
1.
The
N
2
-BLAST
®
is supplied with ½” NPT Female inlet and outlet
fittings. Make sure to use Teflon tape or similar on all fittings to make
sure they don’t leak.
2.
Install the “Supply Line” coming from the air compressor to the
N
2
-
BLAST
®
’s Air Inlet.
3.
Connect the
N
2
-BLAST
®
to the storage tank and then to the systems Air
Maintenance Device(s).
4.
Once connections are made and the air compressor is on, you can
slowly open the System’s
On/Off Valve.
a.
You will hear air rushing through the system and N
2
filling the FPS
system.
b.
If you hear a leak or have a bad connection, shut the valve off and