-16-
For Machines Mfg. Since 8/09
SB1024/SB1025/SB1026
P R E P A R A T I O N
Preparation Overview
Things You'll Need
During the setup process, operation, and
maintenance of the machine, you'll need the
following items:
For Lifting (Page 20)
s
!FORKLIFTOROTHERPOWERLIFTINGDEVICE
rated for more than the weight of the
machine.
s
Two lifting web straps rated for the
weight of the machine.
s
!TLEASTTWOOTHERPERSONSTOHELPWITH
the operation.
For Power Connection
s
7ERECOMMENDAQUALIFIEDELECTRICIAN
to ensure a safe and code-compliant
connection to the power source. (Refer to
Page 24
for details.)
For Assembly
s
Cotton disposable rags
s
Cleaner/degreaser (see
Page 18
)
s
3AFETY
glasses for each person
The purpose of the preparation section is to help
you prepare your machine for operation.
The typical preparation process is as follows:
1.
Unpack the machine and inventory the
contents of the box/crate.
2.
Clean the machine and its components.
3.
Identify an acceptable location for the
machine and move it to that location.
4.
Level the machine and either bolt it to the
floor or place it on mounts.
5.
Assemble the loose components and make
any necessary adjustments or inspections to
ensure the machine is ready for operation.
6.
Connect the machine to the power source.
7.
Test run the machine to make sure it
functions properly and is ready for operation.
Summary of Contents for SOUTH BEND LATHE CO.. SB1024
Page 98: ......