4. OVERHEAD RIGGING
WARNING: The installation must be carried out by qualified service personal
only. Improper installation can result in serious injuries and /or damage to
property. Overhead rigging required extensive experience! Working load
limits should be respected, Certified installation materials should be used,
the installed device should be inspected regularly for safety.
•
Make sure the area below the installation place is free from unwanted persons
during rigging, de -rigging and servicing.
•
Locate the fixture in a well ventilated spot, far away from any flammable materials
and/or liquids. The fixture must be fixed at least 50cm from surrounding walls.
•
The device should be installed out of reach of people and outside areas where
persons may walk by or be seated.
•
Before rigging, make sure that the installation area can hold minimum point load
of 10 times the device”s weight. The device should be well fixed; a free swinging
mounting is dangerous and may not be considered!
•
Before the first time use, it must be inspected by professional staff to make sure
safety, inspection regularly every year.
5. MAINS CONNECTIONS
Connect the device to the mains with the supplied power cable. Please note that power
voltage and frequency are the same as the marked voltage and frequency of device
when connecting power. Wire correspondence is as follow:
Cable (EU)
Pin
International
Brown
Live
L
Blue
Neutral
N
Yellow/Green
Earth
The earth must to be connected! Pay attention to the safety! Before taking
into operation for the first time, the installation has to be approved by an
expert.
6. DMX CONNECTION
DMX fixtures are designed to receive data through a serial Daisy Chain. A Daisy Chain
connection is where the DATA OUT of one fixture connects to the DATA IN of the next
fixture. The order in which the fixtures are connected is not important and has no effect
on how a controller communicates to each fixture. Use an order that provides for the
easiest and most direct cabling.
7
ENGLISH
PAR-18-18W-IP65 pro User manual