background image

Page 3

FM1 

F

AST

M

OUNT

33-4210     05/06

5. 

Remove any glass fi ber insulation behind the ceiling around 
opening so the Support Bridge lays fl at against the back 
side of the ceiling surface. 

6.  Fold the Support Bridge so it can be inserted through the 

opening (see 

Figure 4

).

7.  Move any wiring or conduit aside and insert the Support 

Bridge through the opening.

8. 

Unfold the Support Bridge back to its original position and 
place into the speaker cutout. The four Locating Tabs at the 
inside edges of the support bridge will aid in centering the 
assembly (see 

Figure 5

).

C AU T I O N :  I M P R O P E R   U S E ,  I N S TA L L AT I O N   O R 
ACCIDENTAL RELEASE OF THE SPRINGS MAY CAUSE 
INJURY. ALWAYS WEAR SAFETY GLASSES AND KEEP 
FINGERS AWAY FROM THE SPRING ASSEMBLIES.

NCB-FM1 BRACKET INSTALLATION IN NEW 
CONSTRUCTION

The NCB-FM1 New Construction Bracket (

Figure 6

) is used to 

pre-install the mounting hardware before the gypsum board ceil-
ing is installed. The bracket wings have holes at 12”, 16”, 19.20” 
and 24” center to center to allow mounting into most standard 
joist spacing, including APA spans for performance rated I-Joists 
(PRI).  The circular opening at the center can be used as an 
edge guide for a rotary cutting tool.

Engage the loose end of the springs into the “install” tabs 
(see 

Figure 7

).

Attach the bracket to the ceiling joist structure using #4d 
nails or screws.

CAUTION: IMPROPER USE, INSTALLATION OR ACCIDEN-
TAL RELEASE OF THE SPRINGS MAY CAUSE INJURY. 
ALWAYS WEAR SAFETY GLASSES AND KEEP FINGERS 
AWAY FROM THE SPRING ASSEMBLIES.

TBS-FM1

Support

Bridge

Locating Tabs

Figure 4: 

Inserting the TBS-FM1 into the Ceiling Opening

Figure 5: TBS-FM1 Locating Tabs

Figure 6: NCB-FM1 New Construction Bracket

Install Tab
(with Spring Engaged)

Figure 7: Engaging the Springs in the Install Tabs

Summary of Contents for FAST MOUNT FM1 Series

Page 1: ...onstruction PROVIDED HARDWARE TBS FM1 Support Bridge Shipped with loudspeaker if ordered for Existing Construction NCB FM1 New Construction Bracket Shipped separately if ordered for New Construction T...

Page 2: ...n before the ceiling is finished See Figure 2 UNPACKING AND INSPECTION Open the shipping cartons carefully and remove all contents Inspect the product and accessories for damage Report damage or short...

Page 3: ...The NCB FM1 New Construction Bracket Figure 6 is used to pre install the mounting hardware before the gypsum board ceil ing is installed The bracket wings have holes at 12 16 19 20 and 24 center to c...

Page 4: ...penings on the input connector according to the chart in Figure 9 NOTE When using multiple speakers you can connect the speakers either in parallel or in the loop thru method see Figure 10 3 Use a sma...

Page 5: ...ully remove the protective cardboard from the loudspeaker s front surface 5 Apply slight pressure downward by holding the loudspeaker rim until the springs disengage from the mounting hardware retaini...

Page 6: ...stem 0 82 lb 0 37kg Magnet with 1 02 26mm voice coil Frequency Response 80Hz 15kHz 4dB Power Rating 20 Watts RMS as per EIA standard RS 426 A Pressure Sensitivity 94dB 1W 1m System Impedance 8 ohms no...

Page 7: ...Page 7 FM1 FASTMOUNT 33 4210 05 06...

Page 8: ...Sound Advance and FastMount are registered trademarks of Dana Innovations All rights reserved SOUND ADVANCE 212 Avenida Fabricante San Clemente CA 92672 800 592 4644 or 949 492 5449 FAX 949 361 5151 W...

Reviews: