– 18 –
gear (LDG-D)
5
gear (loading FT)
6
polyethylene washer
2
tension spring (LD-2)
2
tension spring (LD-1)
gear (LDG-FB)
lever (LDG-A)
hole
hole
4
Align hole in the gear (LDG-D)
with hole the lever (LDG-A).
3
Move the lever (LDG-B)
in the arrow direction.
1
shaft
A
shaft
B
2
Fit the lever (LDG-B) on
shafts
A
and
B
and
install it.
3
type-E stop ring 2.0
shaft
A
shaft
B
shaft
C
1
Fit the lever (LDG-A) on
shafts
A
–
C
and install it.
LEVER (LDG-A) / (LDG-B)
GEAR (LOADING FT)
Summary of Contents for XR-C8100R
Page 3: ... 3 SECTION 1 GENERAL This section is extracted AEP UK model s from instruction manual ...
Page 4: ... 4 ...
Page 5: ... 5 ...
Page 6: ... 6 ...
Page 7: ... 7 ...
Page 8: ... 8 ...
Page 9: ... 9 ...
Page 10: ... 10 ...
Page 11: ... 11 ...
Page 12: ... 12 ...
Page 13: ... 13 ...
Page 32: ...6 6 PRINTED WIRING BOARD MAIN SECTION SIDE B 35 36 XR C9100R Page 47 Page 47 Page 47 Page 47 ...
Page 41: ...6 15 SCHEMATIC DIAGRAM DISPLAY SECTION 51 52 XR C9100R Page 48 ...