– 9 –
DC BIAS CURRENT Adjustment
(with no signal input)
Note:
1.
DC BIAS CURRENT adjustments should be made 30 seconds after
the POWER switch is turned on (POWER ON).
2.
After replacing the power transistors, DC BIAS CURRENT adjustments
should be perfomed.
Procedure:
Digital volt meter
+
–
1
2
3
R615
R665
R016
R715
R765
AMP BOARD
[AMP BOARD] (COMPONENT SIDE)
R665
RV651
1
2
3
D973
D971
D972
C987
C988
C985
C986
1
2
3
R668
R765
RV751
R017
R768
RV001
R016
R715
RV701
R718
R615
RV601
R618
3
2
1
3
2
1
1
2
3
FRONT Rch
REAR Rch
FRONT Lch
REAR Lch
CENTER
Connecting
Adjustment
Reading on
point
part
Digital volt meter
FRONT Lch
R615
RV601
20 mV
FRONT Rch
R665
RV651
20 mV
CENTER
R016
RV001
20 mV
REAR Lch
R715
RV701
20 mV
REAR Rch
R765
RV751
20 mV
SECTION 3
ELECTRICAL ADJUSTMENTS
Summary of Contents for TA-VA80ES
Page 5: ... 5 TA V88ES Front Panel Description ...
Page 6: ... 6 TA VA80ES Front Panel Description ...
Page 24: ......
Page 25: ......
Page 26: ......
Page 27: ......
Page 28: ......
Page 29: ......
Page 30: ......
Page 31: ......
Page 32: ......
Page 33: ......
Page 65: ...STR DA80ES TA V88ES TA VA80ES 3 4 2 SCHEMATIC DIAGRAM ...