2-10
4
GEAR
JOINT 1
3
GEAR JOINT 2
1
SCREW
2
BRAKET GEAR
2-4-7 Ass’y Motor Loading Removal
1) Remove the screw
1
.
2) Remove the Ass’y Motor Loading
2
.
Fig.2-18 Ass’y Motor Loading Removal
2-4-8 Bracket Gear, Gear Joint 2, 1 Removal
1) Remove the SCREW
1
.
2) Remove the Bracket Gear
2
.
3) Remove the Gear Joint 2
3
.
4) Remove the Gear Joint 1
4
.
Assembly:
1) Be sure to align dot mark of Gear Joint 1
1
with dot mark of
Gear Joint 2
2
as shown Fig 2-20.
(Refer to Timing point1)
2) Confirm the Timing Point 2 of the Gear Joint 2
2
and Slider
Cam
3
.
Fig. 2-19 Bracket Gear, Gear Joint 1, 2 Removal
Fig. 2-20 Gear Joint 1, 2 Assembly
2
ASS'Y MOTOR
LOADING
1
SCREW
TIMING POINT 1
TIMING POINT 2
1
GEAR JOINT1
2
GEAR JOINT2
3
SLIDER CAM
www. xiaoyu163. com
QQ 376315150
9
9
2
8
9
4
2
9
8
TEL 13942296513
9
9
2
8
9
4
2
9
8
0
5
1
5
1
3
6
7
3
Q
Q
TEL 13942296513 QQ 376315150 892498299
TEL 13942296513 QQ 376315150 892498299