1-7 (E)
PFV-L10
RK 5
x
16
RK 5
x
16
Ornamental washer
Ornamental washer
1-6-2. Rack Mounting Procedure
Explains the procedure for rack mounting by Rack Mount
Kit RMM-10.
n
Fasten the screws at the tightening torque below.
Tightening torque: 120
x
10
_
2
N
.
m {12.2 kgf
.
cm}
1.
Attach the rack brackets in the side panels of the unit
with the specified six screws.
n
Be sure to use B4
x
6 as a screw.
2.
Loosen the screws at the rear of the each adaptor,
before adjusting each adaptor length to the rack depth.
(Following figure is case of left side.)
n
The maximum depth of an adaptor is 750 mm.
The minimum depth of an adaptor is 595 mm.
3.
Firmly lay the right and left adaptors in the rack with
the specified six screws.
(Following figure is case of left side.)
4.
Fasten the length adjustment screws which are loos-
ened in step 2.
5.
Align the crook of the each rack bracket on the side
panels of the unit with the rail, then slide the unit
backward.
n
Each rack bracket covers the rails as shown in the
figure below.
6.
Fix the unit to the rack with the specified screws and
ornamental washers.
1-6. Rack Mounting
B 4
x
6
B 4
x
6
Rack bracket
Rack bracket
B 4
x
10
2U
31.75
31.75
B 4
x
10
Front
Rear
Rack bracket
Rail
Rack bracket
Rail
Rail portion
B 4
x
6
(Length adjustment
screws)