3-1
NEX-EA50CH/EA50CK/EA50EH/EA50H/EA50JH/EA50K/EA50UH
3. ASSEMBLY
3-1. ASSEMBLY
Assembly-1:
Putting position of the IM Adjust Washer
(A, B, C).
Adjust IM Washer A
Adjust IM Washer B
Adjust IM Washer C
1
2
3
Screw tightening sequence when
assembling the Imager Block.
Imager Block
Assembly-4:
Apply grease on the MB N Plate SP.
MB N Plate SP
G
G-85
(J-6082-626-A)
Assembly-5:
Installation Cautions of the Optical Filter
Block.
The two-layer
side is on the
imager side.
Mount
Side
Imager
Side
Optical Filter Block
Flare Cut IM Plate (754)
Glass Retainer IM Plate (754)
The two-layer side of the Optical filter block is on the
imager side.
Assembly-6:
Installation Cautions of the Control Switch
Block (GZ92000) and GZ Frame.
Control Switch Block
(GZ92000)
GZ Frame
Tighten these screws first.
Tighten these screws later.
Tighten these screws, while pushing the GZ Frame
in the direction of the arrow.
Assembly-2:
Method of attachment of the MB Mask
Sheet.
Note:
There should not be any misalignment when attaching
the MB Mask Sheet.
J-6082-735-A
MB Sheet, Mask
MB Tape,
Mask Sheet
Cabinet (F)
Assembly-3:
Screw tightening sequence when
assembling the MB N Plate (A (945)).
1
2
3
4
MB N Plate (A(945))
Assembly-7:
Routing there Flexible Boards.
FP-2015 Flexible Board
FP-2015 Flexible Board
FP-2014 Flexible Board
FP-2021 Flexible Board
FP-2021 Flexible Board
FP-2021 Flexible Board
FP-2015 Flexible Board
FP-2014 Flexible Board
FP-2014 Flexible Board
FP-2025 Flexible Board
When bending Flexible Boards,
be careful not to disconnect them.
FP-2024 Flexible Board
FP-2024 Flexible Board
FP-2016 Flexible Board
FP-2016 Flexible Board
FP-2000 Flexible Board
FP-2000 Flexible Board
FP-2001 Flexible Board
FP-2001 Flexible Board
FP-2013 Flexible Board
FP-2013 Flexible Board