![Sony Large Hospitality Table Stand CH-SSTLU Installation Instructions Manual Download Page 7](http://html.mh-extra.com/html/sony/large-hospitality-table-stand-ch-sstlu/large-hospitality-table-stand-ch-sstlu_installation-instructions-manual_422712007.webp)
Installation Instructions
CH-SSTLU
7
7.
Hang display onto top rail of table stand interface (B) using
hooks on top of vertical interface brackets (C). (See Figure 7)
8.
Gently set back of display against lower rail of table stand
interface. (See Figure 7)
Figure 7
9.
Use four 1/4-20 x 1/2" button head security cap screws (J)
and two interface clamp brackets (E) to secure vertical
interface brackets (C) to table stand interface (B). (See
Figure 8)
Figure 8
Cable Management
The CH-SSTLU can be set up for two types of cable
management. One calls for the cables to be routed strictly
through the pole portion of the table stand. The other routes the
cables through the pole and through a pre-drilled hole in the
desk.
Cable Management (pole only)
1.
Route cables from display into upper hole on pole portion of
table stand. (See Figure 9)
2.
Route cables down the pole and out of lower hole. (See
Figure 9)
Figure 9
Cable Management (through desk)
1.
Route cables from display into upper hole on pole portion of
table stand. (See Figure 10)
2.
Route cables down the pole and through hole drilled in desk
during desk installation. (See Figure 10)
3.
Install cable port cover (F) into lower hole on pole portion of
table stand. (See Figure 10)
Figure 10
7
8
(C) x 2
(B)
Display
(E) x 2
9
(J) x 4
Cable (typical)
1
2
3
2
1
(F)
Desk